US residential solar installer Sunrun is deploying aggregated rooftop solar-plus-batteries in partnership with utility Southern California Edison (SCE), in a demonstration project of the systems’ capabilities to run as a virtual power plant (VPP).
Another three developers with more than a gigawatt-hour of wins in Hawaiian Electric’s (HECO’s) massive solar-plus-storage and standalone energy storage tenders have gone public with size and location details of their proposed projects.
While utility Hawaiian Electric (HECO) stands poised to announce the finalists of its recent massive procurement of solar-plus-storage and standalone energy storage projects, developers with winning bids seem determined to steal the utility’s thunder.
The Asian Development Bank (ADB) has signed a loan deal for its first wind energy-plus-battery storage project in Thailand, which is also the country’s first private sector initiative to combine the two technologies at scale.
A 1MW battery storage system with as much as 150 hours of storage duration, using an as-yet unrevealed battery chemistry, is being deployed in a pilot by Minnesota electric utility Great River Energy.
The cost of battery energy storage has continued on its trajectory downwards and now stands at US$150 per megawatt-hour for battery storage with four hours’ discharge duration, making it more and more competitive with fossil fuels. Andy Colthorpe spoke to Tifenn Brandily, lead author of BloombergNEF’s latest LCOE report.
Contracts have been awarded to 770MW of battery energy storage project proposals by Southern California Edison (SCE), one of the US state of California’s three major investor-owned utilities (IOUs).
Making energy affordable for all, even communities in Africa that have never had access to a reliable grid, need not be as daunting a task as it may sound, argues Dr Amrit Chandan, CEO of circular economy lithium-ion battery company Aceleron.
Plans for what is being billed as “Europe’s largest solar plant” have been put forward in Spain as the UN climate negotiations came to a close in Madrid.
Engie has been hired by Guam’s state electricity utility to build two solar-plus-storage plants with a combined capacity of 50MWp/300MWh on the Micronesian island.