
The financial picture for China-based battery OEM Narada Power has continued to worsen, and this year saw it fall to the lowest rating in the Battery StorageTech Bankability Ratings Report.
The integrated lithium-ion battery and battery energy storage system (BESS) company now has a 0 (out of 10) Financial Score in the report by our in-house market research team PV Tech Research, the lowest possible score.
Narada also has a C Bankability rating, also the lowest possible. CATL and Sungrow currently top the list (AAA) and have financial scores of 8.93 and 9.62.
That follows operating losses for Narada every quarter since Q4 2025 and in Q3 2026 it had an operating margin of -137.5%, leading to worsening liquidity issues, said PV Tech analyst Charlotte Gisbourne.
Try Premium for just $1
- Full premium access for the first month at only $1
- Converts to an annual rate after 30 days unless cancelled
- Cancel anytime during the trial period
Premium Benefits
- Expert industry analysis and interviews
- Digital access to PV Tech Power journal
- Exclusive event discounts
Or get the full Premium subscription right away
Or continue reading this article for free
That led to a Q3 negative working capital of around RMB -4.46 billion (-US$669 million), compared to the end of last year where it stood at around RMB -2.95 billion. Revenue in Q3 was down 72%, and in H1 2026 its operating costs in all business units and products exceeded revenues.
In H1 2026 the capacity utilisation rate of its lithium-ion battery manufacturing capacity was only 22%. The top players have capacity utilisation rates of well over 90%.
That worsening financial picture has translated into a sharp fall in its share price on the Shenzhen Stock Exchange (SZSE). It started the year around RMB 17.31, but has since fallen 86% to RMB 2.37 at the time of writing. It saw a particularly sharp drop in April and May upon the release of its Q1 report.
The current share price equates to a market capitalisation of RMB 2.08 billion, or US$312 million, for a company with double-digit gigawatt-hours of battery and BESS manufacturing capacity (each).
If a BESS supplier ceases operating, there is a high risk that the performance warranties it provided may no longer be honoured. Narada Power has deployed many tens of GWh of product since it was founded, so observers may be closely following the firm’s next few quarters.
The firm has continued to have a strong presence at major trade shows, including this year’s RE+ US trade show in Las Vegas last week and the Energy Storage International Summit and Exhibition (ESIE 2026) in China in Spring. Its recently announced major projects have in large part been in India.