The vice-president for marketing and product strategy at one of only two inverter suppliers to Tesla says it has promised customers that it can “get the battery within six months”.
An energy storage project aimed at enabling the grid integration of 1MW of solar and 4.5MW of wind on the Portuguese island of Graciosa will be supplied with batteries by Leclanché.
A 1MWh battery developed by US manufacturer Aquion Energy and installed at a private estate in Hawaii will allow the area’s residents to meet almost all of their electricity demand with power generated from a connected solar array.