LG Energy Solution partners with B2U Storage for second life US BESS projects

LinkedIn
Twitter
Reddit
Facebook
Email

US second-life energy storage firm B2U Storage Solutions has formed a strategic partnership with South Korean battery giant LG Energy Solution (LG ES).

Announced 24 September, B2U will be able to repurpose battery energy storage system (BESS) cells from LG ES for grid-scale solutions.

The companies stated that the agreement looks to extend the life of the batteries through repurposing, keeping them in service for longer while deferring both the costs and environmental impacts of recycling.

Earlier this month, B2U put the 28MWh Bexar Martinez BESS project into commercial operation near San Antonio, Texas. The System was built using repurposed electric vehicle (EV) batteries.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

In June, the company secured a strategic supply agreement with autonomous vehicle company Waymo, seeing the batteries retired from automotive use in Waymo’s fleet being installed into grid-scale BESS projects.

Second life BESS companies have been fairly active this year. In May, second life BESS firm Moment Energy announced a US$40 million Series B funding round to accelerate its battery factory.

Redwood Energy, the energy storage division of Redwood Materials, also makes use of repurposed EV batteries, and discussed the process with Energy-Storage.news Premium in March.

In August, LG ES began production at its lithium iron phosphate (LFP) and nickel manganese cobalt (NMC) battery cell factory in Lansing, Michigan.

Following that news, LG ES said it would source 8,000 metric tonnes of battery-grade lithium carbonate sourced in Arkansas from Smackover Lithium, over a period of 10 years.

22 February 2027
InterContinental London - The O2, London, UK
The Future of Energy Storage Starts Here Three days in London where developers, IPPs, investors, utilities and the manufacturers building the technology come to close deals, not swap business cards. If you need to be in the room with the people deploying capital into European storage, this is that room.
20 April 2027
Renaissance Dallas at Plano Legacy West Hotel, Dallas, Texas, Dallas
Policy, Procurement and Power Demand: Defining the Next Chapter for Energy Storage. Two days in Dallas where developers, IPPs, investors, utilities and the manufacturers building the technology come to close deals, not swap business cards. If you need to be in the room with the people deploying capital into US storage, this is that room.

Read Next

November 27, 2026
Alpiq has applied for planning approval for a 300MW/1,200MWh BESS in Niedergösgen, in the canton of Solothurn, Switzerland.
November 27, 2026
Blue Elephant Energy has acquired a 95% stake in a 40MW/160MWh BESS project in the Netherlands from developer TPSolar.
November 26, 2026
NYSE-listed energy infrastructure company Energy Vault has reported its Q3 2026 financial results and the close of non-recourse project financing for its 150MW/300MWh SOSA Energy Centre in Texas, US.
November 26, 2026
The first units of a BESS have arrived at European Energy’s operational Mokoan solar PV plant in northern Victoria, Australia.
November 25, 2026
A grid-scale battery energy storage system (BESS) planned for the Yukon Territory of northern Canada has lost its contractor, Canadian battery storage engineering and construction company SunGrid.