Utility-scale battery storage developer Jupiter Power’s 700MW/2,800MWh Trimount battery energy storage system (BESS) in Everett, Massachusetts, US, has been approved by state officials.
The Governing Board of the Puerto Rico Electric Power Authority (PREPA) has approved renewables developer Polaris Renewable Energy’s battery energy storage system (BESS) standard offer (SO1) agreement.
Zinc hybrid cathode battery and storage system maker Eos Energy reasserted its vision for 2026 and beyond in its Q4 and full-year 2025 financial results.
Quebec-based IPP Boralex and Six Nations of the Grand River Development Corporation (SNGRDC) have commissioned the 300MW/1,200MWh Hagersville Battery Energy Storage Park in Haldimand County, Ontario, CA.
Iron-sodium battery manufacturer Inlyte Energy and data centre operator NTS Colocation are partnering to deploy 2MW of iron-sodium battery capacity by 2028.
Energy storage developer and subsidiary of Canadian Solar, Recurrent Energy, has sold its 200MWh Fort Duncan battery energy storage system (BESS) project, located in Texas, US, to developer Hunt Energy Network.
The US Department of Energy (DOE) has closed a US$26.5 billion loan package to two wholly owned subsidiaries of utility Southern Company, in Georgia and Alabama, US.
Utility Xcel Energy will install 30GWh of US startup Form Energy’s iron-air batteries at a data centre in Pine Island, Minnesota, belonging to tech giant Google.
In this Energy-Storage.news roundup, FlexGen updates its EMS, LandGate launches a BESS site selection tool, ON.energy and Shoals target AI data centres, and Sunrun has a successful season of dispatching energy with PG&E.