Australian renewable energy developer Edify Energy has confirmed that the 185MW/370MWh Koorangie battery energy storage system (BESS) in Victoria is fully operational.
The Australian Energy Market Operator (AEMO) has made grid-forming BESS a priority for the National Electricity Market (NEM) and South West Interconnected System (SWIS) for 2026.
Huawei Digital Power has successfully commissioned what it claims is Cambodia’s first grid-forming battery energy storage system (BESS) certified by TÜV SÜD.
French independent power producer (IPP) Neoen has started operations at its 270MW/540MWh Western Downs stage one battery energy storage system (BESS) in Queensland, Australia.
Renewable energy developer ACEnergy has seen its 250MW Joel Joel battery energy storage system (BESS) in Victoria, Australia, granted its 5.3.4A notification.
Italy and Spain are set to soar as energy storage markets with multiple gigawatt-hours under construction and much more in the pipeline, but there are questions around the regulatory frameworks driving deployments in each country.
Goldwind discusses how its unmatched system-level expertise from the renewables space makes it ideally placed to solve the key industry challenges it sees emerging in energy storage.