The second and final instalment in Energy-Storage.News’ blog on the Aliso Canyon energy storage procurement takes a look at some of the most impressive projects in the deployment, as well as what this all means for the future of the industry.
A “first of its kind” collaboration between energy storage provider Sonnen and transmission system operator TenneT will integrate solar and batteries into energy networks in Germany using blockchain technology.
A 500MW energy storage facility with “5-8 hours” storage duration could be built in San Diego, California, with a local water authority seeking detailed proposals for such a project to support the grid and help integrate renewable energy.
In the first of a two-part blog series on the energy storage response to the infamous Aliso Canyon gas leak in California, Energy-Storage.News sets the scene of how the California Energy Commission and chosen system suppliers got their heads around solving a mammoth power shortage with many, many batteries, in a race against time.
Investor-owned energy company National Grid, responsible for electricity and gas delivery in New York, Massachusetts and Long Island, will build a 5MW / 40MWh energy storage facility in Long Island with NextEra Energy.
Multinational utility Engie will install a 1MW / 4MWh Eos Energy Storage zinc hybrid cathode battery system in Brazil and is expected to “exercise the system to its operational boundaries”.
NextEra Energy Resources will build a 10MW lithium-ion battery storage system paired with a 20MW PV installation for Arizona utility Salt River Project, with another battery system on the way.
Projects that demonstrate how energy storage can benefit a wide range of stakeholders and the electric grid can compete for US$15.5 million of funding from the New York State Energy Research and Development Authority (NYSERDA).
Work has been completed on a 1MW / 2MWh battery energy storage system for a ‘multi-resource microgrid’ in Denver, by Younicos and its project partners, Panasonic and utility Xcel Energy.