Second-life BESS firms B2U, Moment and Rebaba advance project operations, US compliance, and new financing

LinkedIn
Twitter
Reddit
Facebook
Email

Second-life battery energy storage system (BESS) firms B2U, Moment and Rebaba are advancing project operations in Texas, US compliance, and new financing in Europe, respectively.

B2U begins operations at second repurposed Texas BESS project

Second life energy storage firm B2U Storage Solutions has put its 28MWh Bexar Martinez BESS project into commercial operation near San Antonio, Texas, US.

Announced 9 September, the Bexar Martinez project is connected within utility CPS Energy’s service territory and built from repurposed electric vehicle (EV) batteries.

It is the second site in Texas where B2U has developed and equipped its patented second-life BESS cabinets. The company claimed that projects using its technology receive “significantly higher returns than those available from other domestic BESS vendors.”

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The Bexar Martinez project and B2U’s other sites also qualify for the domestic content bonus under the investment tax credit (ITC), have received 3rd party financing, and have been acquired by B2U Infrastructure Partners.

In November 2023, B2U put its second major project into commercial operation, the 3MW/12MWh Cuyama BESS using Honda Clarity EV batteries, located near New Cuyama, California.

The company’s flagship project, the 28MWh Sierra facility, which is also located in California, uses batteries from multiple vehicle manufacturers, including Nissan, Chevy, Tesla and Ford.

In December 2025, our colleagues at EV Infrastructure News reported that B2U launched a structured finance fund with a portfolio of seven second-life BESS projects.

The company will retain an interest in the fund while managing day-to-day operations of projects owned by the fund. Via this strategic financing, B2U will divest operating projects and invest the proceeds in the business.

This June, B2U secured a strategic supply agreement with autonomous vehicle company Waymo, which sees batteries retired from automotive use in Waymo’s fleet being installed into grid-scale BESS projects.

Moment Energy claims FEOC compliance and non-PFE status through third-party verification

EV-to-BESS battery specialist Moment Energy has announced that a third-party has verified its non-prohibited foreign entity (non-PFE) status and foreign entity of concern (FEOC) compliance for its new BESS.

Announced 9 September, Moment claimed the review was done by an unnamed top 10 US law firm and included scrutiny of the company’s corporate ownership, effective control, and debt financing structure.

This verification adds to the domestic manufacturing benefit Moment has previously used as a selling point for its product.

In May, Energy-Storage.news Premium spoke with Moment Energy’s CTO and co-founder Gabriel Soares, and VP of business development, Carl Mansfield. Mansfield said the US market will face a lack of products that can meet ITC compliance regulations through mid to late 2027.

He continued, “We’ve been pretty heavily involved in reviewing with expert and outside legal counsel what the actual (FEOC) guidance is.”

Moment claimed its BESS is integrated with FEOC-compliant power conversion systems (PCS), providing customers with a straightforward path toward a fully FEOC-compliant system.

The company is designing its North American supply chain to meet increasingly stringent material assistance cost ratio requirements through 2030 under the rules as currently defined and is committed to adapting as those requirements continue to evolve.

Further, in response to the guidance initially published by the US Treasury, Moment submitted formal comments and met with Treasury officials, sharing industry perspectives on the implementation and future development of new FEOC and PFE requirements.

May also saw Moment announcing a US$40 million Series B funding round to accelerate its battery factory. In 2025, the company’s second-life BESS manufacturing hub in Vancouver, British Columbia, Canada, reached full-scale production. The facility produces its Luna BESS, a 400kWh/1MWh system that can be scaled into 10MWh.

In November 2025, Moment launched a partnership with the strategic venture capital arm of Latin American energy leader Copec, in which Moment will deploy gigawatt-hours of second-life BESS projects across Latin America and Europe.

Rebaba raises US$4.6 million in oversubscribed seed round for second-life BESS

Swedish energy technology company Rebaba has raised SEK 44.1 million (US$4.6 million) for its circular BESS solution.

Announced 9 September, the US$4.6 million was raised through an oversubscribed seed round led by venture capital (VC) fund Sistafund, alongside pan-European initiative EIT Urban Mobility, with participation from existing shareholders and new European investors.

Rebaba combines EV batteries recovered from the market with its patent-pending technology. The company is coming off of one year of production at its flagship CircularHub in Stockholm, and now operates commercial deployments across Sweden.

Rebaba’s two BESS products, Companion, a compact 40kWh cabinet-based BESS for residential and smaller commercial applications, and Containerised, a larger-scale system for commercial and industrial (C&I) applications, enable customers to engage in load shifting, local generation storage, peak shaving, and grid balancing services.

Rebaba is now scaling operations to meet rising commercial demand, including fulfilling recently signed contracts in Sweden and Denmark that had not been previously disclosed.

The company said its plans include expansion of its CircularHub to a capacity of 40MWh/year, an amount that would avoid approximately 4,000 tonnes of CO2/year, as well as hiring across multiple roles.

To serve European markets more effectively and streamline logistics, Rebaba is working to establish additional manufacturing CircularHubs beyond Sweden.

The company’s expansion is backed by a growing distribution network that includes agreements with Swedish renewables company KP Energy, Scandinavian fuel and renewables company OKQ8, renewable technology company nanuq, which is active in Germany, Austria, and Switzerland, and French company Smartports, which transforms parking lots into solar, EV charging, and BESS hubs, alongside other major European partnerships that have been signed but not yet disclosed.

15 September 2026
San Diego, USA
You can expect to meet and network with all the key industry players again in 2025 from major US asset owners, operators, RTOs and ISOs, optimizers, software and analytics providers, technical consultancies, O&M technology providers and more.
15 September 2026
Berlin, Germany
Launching September 2026 in Berlin, Energy Storage Summit Germany is a new standalone event dedicated to Germany’s energy storage market. Bringing together investors, developers, policymakers, TSOs, manufacturers and optimisation specialists, the Summit explores the regulatory shifts, revenue models, financing strategies and technology innovations shaping large-scale deployment. With Germany targeting 80% renewables by 2030, it offers a focused platform to connect with the decision-makers driving the Energiewende and the future of utility-scale storage.
6 October 2026
Warsaw, Poland
The Energy Storage Summit Central Eastern Europe is set to return in September 2025 for its third edition, focusing on regional markets and the unique opportunities they present. This event will bring together key stakeholders from across the region to explore the latest trends in energy storage, with a focus on the increasing integration of energy storage into regional grids, evolving government policies, and the growing need for energy security.
3 November 2026
Málaga, Spain
Understanding technology and supplier selection for Europe’s utility-scale PV market in 2027. PV ModuleTech Europe 2026 is a two-day conference that tackles these challenges directly, with an agenda that addresses all aspects of PV module, inverter and battery supplier selection; product availability, technology offerings, supply chain traceability, quality assurance, factory auditing, system reliability, and supplier bankability.

Read Next

Premium
September 10, 2026
We hear from Angus Gordon Lennox, chair of the Gore Street Energy Storage Fund (GSF), which faces a shareholder vote next week on its future. 
September 10, 2026
A roundup of large-scale BESS news from in and around the Nordic region, with Sweden-based Flower building a project in Germany, Volvo launching one in Sweden and Delta Capacity securing a toll for one in Finland. 
September 10, 2026
Akaysha Energy’s Waratah Super Battery in Australia briefly reached its full rated output of 850MW on 7 September.
September 10, 2026
The venture-capital-style returns once available in Australia have disappeared, according to panellists at the Battery Asset Management Summit Australia 2026.
September 9, 2026
Utility Black Hills Energy has announced it will move forward with the construction of a 50MW/200MWh energy storage facility at its Pueblo Airport Generating Station (PAGS) in Colorado, US.