Return and Engie, EnBW and Zelestra agree long-term BESS tolls in Spain, Italy

LinkedIn
Twitter
Reddit
Facebook
Email

Return and Engie have agreed a long-term BESS toll in Spain while EnBW and Zelestra have finalised one in Italy, totalling 55MW and 300MW of capacity respectively.

Return and Engie sign 10-year toll for Spanish BESS

BESS owner-operator Return and power firm Engie have signed a 10-year toll for three battery energy storage system (BESS) projects in Spain.

The three projects total 55MW/220MWh, are all in the Basque region, and will come online by the end of 2027.

Under the deal, Return will develop, own and operate the assets, while Engie will optimise their flexibility across Spain’s wholesale and ancillary services markets. It is a full tolling agreement, which generally would mean Engie pays Return a fixed amount and keep all of the potential upside.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Return said it builds on an existing partnership in Germany, although it hasn’t previously officially announced a toll with Engie there.

Engie is deploying its own large-scale BESS projects globally, including in the US, Chile and across Europe, but is also a major provider of tolls. It recently agreed a toll with BESS platform Flower in Germany covering 657MWh of capacity and then announced one with developer Ignis in Spain for a similar amount.

The toll with Ignis is noteworthy as it only gives Engie the right to the BESS’ dispatch in the day-ahead and intraday market, while Ignis will remain responsible for operating the BESS in balancing services (ancillary services).

Large-scale BESS activity in Spain has picked up since the Iberian blackout in Spring 2025. Notably, the government has accelerated its rollout of EU-backed grants for energy storage, passed a grid resilience decree, and launched a capacity market (CM).

EnBW procuring capacity from Zelestra’s 500MW Italy BESS

Power firm EnBW will procure 300MW of capacity from a 500MW/2,000MWh BESS that IPP Zelestra will build and own in Emilia-Romagna, northern Italy.

The companies have agreed the toll for 60% of the project’s capacity for an unspecified period, only calling it ‘long-term’. Construction will start in 2027 for commercial operation in 2028.

It could be the same project that Zelestra and BKW agreed a toll for, back in September 2025, based on location and timeline. At the time they only said it could cover ‘up to 2GWh’ of capacity, so perhaps the capacity is being split between EnBW and BKW.

The project with is not one of the dozen or so that won long-term revenue contracts from Italy’s TSO Terna in the MACSE auction. MACSE is Terna’s way of ensuring there is enough storage to balance solar generation in the south of Italy.

Zelestra’s Italy CEO Eliano Russo discussed the auction, why the company decided not to proceed in it, and what implications it would have for the wider offtake space in an interview with us for the Energy Storage Report 2026, which you can access here.

The IPP has also announced long-term offtake deals for its solar-plus-storage projects in Spain.

BKW has also been the offtaker for Zelestra’s solar projects in Italy, including the Ginosa and Bellomo projects, the latter under construction (pictured above).

3 November 2026
Málaga, Spain
Understanding technology and supplier selection for Europe’s utility-scale PV market in 2027. PV ModuleTech Europe 2026 is a two-day conference that tackles these challenges directly, with an agenda that addresses all aspects of PV module, inverter and battery supplier selection; product availability, technology offerings, supply chain traceability, quality assurance, factory auditing, system reliability, and supplier bankability.
2 December 2026
Italy
Battery Asset Management Summit Europe is the annual meeting for owners, operators, investors, and optimisation specialists working with operational BESS assets across the continent. The Summit focuses on how to maximise performance and revenue, manage degradation, integrate advanced optimisation software, navigate evolving market and regulatory frameworks, and plan for repowering or end-of-life strategies. With insights from Europe’s most active storage markets, it equips attendees with practical guidance to run resilient, profitable battery portfolios as the sector scales.
22 February 2027
InterContinental London - The O2, London, UK
The Future of Energy Storage Starts Here Three days in London where developers, IPPs, investors, utilities and the manufacturers building the technology come to close deals, not swap business cards. If you need to be in the room with the people deploying capital into European storage, this is that room.

Read Next

October 22, 2026
As demand for battery storage soars, the European Union (EU) has tried to grow its local battery supply chain with mixed success so far, writes PV ESS analyst Charlotte Gisbourne.
Premium
October 22, 2026
BESS investments in the French market are moving to longer durations with saturation expected to hit the secondary reserve market, currently the main way operational projects make their money.
October 22, 2026
IPP and EPC Faria Renewables has inaugurated its 49.9MW/134.16MWh Galani BESS project in Elassona, Greece.
October 21, 2026
German IPP Enertrag and Swiss utility Axpo have launched BESS projects in France, including what could be the country’s first 3-hour project.
October 20, 2026
Developer Ikigai Energy and LDES firm RheEnergise have signed an MOU to develop a pipeline of projects in Italy using the latter’s ‘high-density hydro’ (HD Hydro) technology.