Cameron Murray

Premium
April 17, 2026
Building BESS is complicated, with myriad considerations around supplier contracts, site acceptance tests, data analysis, interface between different contractors.
Premium
April 16, 2026
The attractiveness of the BESS market for M&A and investment, amidst a slowdown in activity, was discussed on a panel at the Energy Storage Summit 2026 in London.
Premium
April 15, 2026
How can the industry prepare for when the first wave of utility-scale BESS projects begin to reach end-of-life?
Premium
April 14, 2026
Over 1.4GW/3.4GWh of grid-scale BESS came online in Europe, likely its best month ever, accounting for almost a fifth of global figures.
April 14, 2026
NGEN and Harmony Energy have made strides in deploying large-scale BESS projects in Germany, launching construction and securing pipeline financing respectively.
Premium
April 13, 2026
We catch up with Tamara de Gruyter, president of Wärtsilä Energy Storage, to discuss the system integrator’s strategy under new leadership.
April 10, 2026
Dutch TSO TenneT has signed a contract with a developer for a large-scale BESS which will help to relieve grid congestion, possibly enabling the quicker deployment of renewables in the Netherlands.
Premium
April 9, 2026
What does the combination of regulatory, supply chain and market pressures mean for the cost of building large-scale BESS this year?
April 9, 2026
Multinational power firm Engie has acquired two large-scale BESS projects in Spain, paired with synchronous condensers and has launched construction on a BESS in France.
April 8, 2026
IPPs Zelestra, BNZ and ALFI have secured offtake and financing to hybridise solar projects with BESS across Spain, Italy, Portugal and Romania. 

Most Popular

Upcoming Events

November 16
 - November 19
, 2026
Las Vegas, Nevada
November 18
 - November 18
, 2026
London, UK
November 19
 - November 19
, 2026
London, UK
November 24
 - November 25
, 2026
Warsaw, Poland
November 26
 - November 26
, 2026
9am GMT / 1pm GST
December 2
 - December 3
, 2026
Italy