Sponsored

VIDEO: How Envision Energy is positioning itself as a system-level energy infrastructure provider

By Solar Media Staff
LinkedIn
Twitter
Reddit
Facebook
Email

We caught up with Kevin Huang, Senior Vice President and President of Energy Storage Product Line at Envision Energy at Smarter E in Munich for a video interview on the company’s energy storage strategy and the growing role of AI data centres in power demand.

Mr. Huang argued that the next wave of competition in energy storage will not be won on cost or container size alone, which is why Envision is positioning itself as a system-level energy infrastructure provider, delivering integrated power systems rather than standalone hardware.

He outlined four pillars: its AI Power System solution; grid-forming technology for voltage and frequency support; automated trading capabilities to help customers generate revenue; and hybrid wind-storage solutions to accelerate deployment and boost power generation.

Commenting on AI data centres, Mr. Huang stressed that the critical challenge here is not how much power is needed but that the power is reliable, low-carbon, cost-competitive and available around the clock. Envision’s total power system approach coordinates wind, solar, grid and storage infrastructure as a single integrated system, a model already deployed in the Chifeng and Ulanqab regions of Inner Mongolia, where data centres are directly connected to renewable generation with grid storage and grid-forming capabilities.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Watch the full interview above.

Read Next

Premium
September 3, 2026
Inertia could provide a strong boost to BESS project returns in Germany, but operators are still waiting for the first prequalified inverters.
September 3, 2026
Bulgaria now has a world-leading amount of battery storage capacity relative to energy system despite a period of political turnover, although those assets are now cannibalising the revenues which attracted investment in the first place.
September 2, 2026
ONE Nuclear Energy has executed a binding letter of intent to develop a 2.88GW natural gas plant and 700MW/2.88GWh energy storage system, co-located with a high-capacity data centre campus.
September 2, 2026
The Italian government has declared an AI data centre in development by Energy Vault, featuring hybrid energy storage technologies, to be of strategic national interest.
September 1, 2026
Three years after the EU Batteries Regulation (EUBR) entered into force, it is becoming easier to separate regulatory expectations from measurable market impacts, writes patent lawyer Chloe Flower.