Quidnet bags 15-year deal with Texas utility for ‘geomechanical pumped storage’ solution

March 8, 2022
LinkedIn
Twitter
Reddit
Facebook
Email

Quidnet Energy, a provider of a novel geomechanical pumped storage (GPS) technology, has struck a 15-year commercial agreement with Texas utility CPS Energy to supply an initial 10MWh system.

Phase one of the project will involved Quidnet delivering an initial one-megawatt (MW) 10-hour storage facility with an option to extent the project to 15MW. The 15-year agreement allows the time for both parties to explore Quidnet’s technology, the press release says.

The Houston-based company’s technology is a form of pumped hydro storage with a 10-hour plus duration. It works by pumping water into an underground reservoir to be stored between impermeable rock layers at high pressure. When the system needs to dispatch electricity, the water is released upwards to power a hydroelectric turbine in a close loop system.

Unlike conventional pumped hydro, it does not need elevated terrain and requires a fraction of the time and cost to build, Quidnet claims. Specifically, it claims that its solution requires half, or less, of the capital expenditure and long-term costs of battery and conventional pumped hydro storage.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The CPS Energy deal marks Quidnet’s sixth test/pilot project, with the previous five in Texas (2), Ohio, New York and Alberta. It claims its projects employ “much of the same expertise, workforce, and supply chains as the oil and gas industry,” providing a natural pathway into the green economy for those professionals.

It has received investment by Bill Gates’ Breakthrough Energy Ventures, Evok Innovations, Trafigura and others, funding from the Department of Energy, and is a founding member of the Long Duration Energy Storage Council. The foundation of acting couple Will and Jada Smith backed the company at its foundation in 2015.

Quidnet’s Texas location and focus is unsurprising. The state is the highest energy consumer in the US, accounting for around one-seventh of the country’s power needs according to the US Energy Information Administration (sixth-highest per capita). It has large energy-intensive sectors based there like petroleum refining and chemical manufacturing, though is still the third-highest net exporter of energy among US states.

For its part, CPS Energy serves the city of San Antonio, portions of seven adjoining counties, and the electric and natural gas infrastructure for a collection of US military installations in the state. The utility is targeting having a 50% renewable energy resource mix by 2040 and full carbon neutrality by 2050.

Read Next

December 18, 2025
Two US companies, GridStor, and CPS Energy are making advancements on Texas energy storage deployments, with GridStor executing a tolling agreement and CPS Energy issuing a new request for proposals.
December 17, 2025
In an upcoming conversation with Energy-Storage.news Premium and Optimisation platform provider Ascend Analytics, CEO Dr. Gary Dorris PhD, discusses the ‘roller coaster’ revenues of the Electric Reliability Council of Texas (ERCOT) market.
December 16, 2025
 Utility Georgia Power has reached an agreement with the Public Interest Advocacy (PIA) staff of the Georgia Public Service Commission (PSC), that, if approved, will help lower energy costs and meet electricity demand in the state.
December 4, 2025
RWE Clean Energy has commissioned the Stoneridge Solar PV project in Texas, adding 200MW of solar PV and 100MW/200MWh BESS to its operational portfolio.
November 28, 2025
The Australian government has officially opened CIS Tender 8, targeting 16GWh of energy storage capacity across the NEM.