The Energy Storage Report 2024

Now available to download, covering deployments, technology, policy and finance in the energy storage market

Hithium and US developer Perfect Power in 1GWh battery MOU

LinkedIn
Twitter
Reddit
Facebook
Email

China-based lithium-ion battery manufacturer Hithium has agreed to supply 1GWh of products to US energy storage project developer Perfect Power through a memorandum of understanding (MOU).

The companies announced the MOU yesterday (9 November) which was signed at Hithium’s headquarters in Xiamen, China. Hithium is one of just a few companies manufacturing lithium-ion batteries at scale that is focused on stationary energy storage rather than electric vehicles (EVs).

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The agreement will see Hithium supply 1GWh of battery products to Perfect Power, which describes itself a developer focused on ‘distributed energy storage’ primarily in California and Texas, the US’ two largest markets for energy storage.

Distributed would include the smaller end of utility-scale projects, with Perfect Power having developed 9.9MW battery energy storage system (BESS) projects in Texas. That includes a 79.2MW portfolio sold last year to UK-based energy storage investor Gore Street Capital. Projects that size and under benefit from a faster grid interconnection process in Texas.

Hithium chairman Jeff Wu commented: “Cooperating with Perfect Power is an exciting step for us in the U.S., allowing us to support projects in two of the country’s largest energy markets, California and Texas. Through this collaborative endeavor, we aim to further the penetration and deployment of advanced energy storage products into the Net Zero transition in the US.”

This year saw Hithium launch in Europe as well as raise US$620 million in capital from investors in a Series C for capacity expansion, equipment purchases and research and development. At the RE+ clean energy expo and conference in Las Vegas in September it launched a 5MWh 20-foot containerised BESS product, one of a swathe of BESS providers to do so this year.

Perfect Power is a portfolio company of private equity firm SER Capital Partners. Perfect Power lists microgrid provider MicroGrid Networks and energy efficiency and renewable energy solutions firm Brightcore Energy as affiliate companies, the former of which was named at the MOU ceremony (picture above).

22 May 2024
London, UK
At the time of writing, Europe had had its most successful year in terms of Power Purchase Agreements (PPAs) with a record 7.8GW of renewable energy contracts signed. As we gather in May 2024 for the third edition of the Renewable Energy Revenues Summit, the energy landscape continues to evolve rapidly, influenced by the beating drum of climate change, volatility around power prices and the need to decarbonise power procurement as well as generation.
22 October 2024
New York, USA
Returning for its 11th edition, Solar and Storage Finance USA Summit remains the annual event where decision-makers at the forefront of solar and storage projects across the United States and capital converge. Featuring the most active solar and storage transactors, join us for a packed two-days of deal-making, learning and networking.

Read Next

Premium
April 26, 2024
Market saturation in the Texas, ERCOT ancillary services market is already happening as the BESS buildout accelerates, Energy-Storage.news has heard.
April 26, 2024
China-based companies Sungrow and Eve Energy are seeing substantial growth in their energy storage product shipments.
April 25, 2024
According to IEA and BloombergNEF, battery storage was the most invested-in energy tech, with biggest-ever growth in deployments recorded.
April 25, 2024
Energy Vault and utility NV Energy have put a 220MW/440MWh battery energy storage system (BESS) into operation in Nevada, US.
April 24, 2024
The New York City Industrial Development Agency (NYCIDA) has approved five BESS projects while governor Kathy Hochul has announced groundbreaking on a sixth, all in all totalling around 42.5MW of capacity.

Most Popular

Email Newsletter