Australian mining giant Fortescue has accelerated its timeline for deploying 4-5GWh of battery energy storage systems (BESS) paired with 1.8GW of renewable energy generation, which it now expects to begin commercial operation by 2028.
Industrial power solutions manufacturer Volvo Penta discusses its battery systems for BESS with a focus on the heavy industry and construction sectors.
Energy-Storage.news speaks with Karina Hershberg, Associate Principal at engineering firm PAE Engineers, on integrating microgrids with sustainable building design.
Viridi Parente has acquired the former Moxion Power production facility in Richmond, California, US, and secured a US$9.3 million grant from the California Energy Commission (CEC).
Mining consortium Kamoa Copper and IPP CrossBoundary Energy have agreed a PPA providing baseload renewable energy for one of the largest copper mines globally, in the Democratic Republic of the Congo (DRC).
Energy-Storage.News Premium reports back from an in-depth discussion of battery storage in the Philippines with panellists including DOE Assistant Secretary Mario C. Marasigan.