GE at ‘very early stages’ of developing Mexico’s first energy storage systems

LinkedIn
Twitter
Reddit
Facebook
Email
Image: wikimedia commons User: Momoneymoproblemz.

General Electric (GE) is developing Mexico’s first ever grid-scale energy storage projects to aid with the integration of wind and solar into electricity networks.

The US multinational was reported by Mexican financial newspaper El Financiero to be developing five such systems, which the paper said was part of an increased investment in renewables. El Financiero said that according to GE Grid Solutions Latin America’s leader of digital solutions, Rodrigo Salim, each system would likely cost at least US$5 million to develop and deploy.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Salim said energy storage could help deliver power resiliency and quality in an age of renewables on the grid, the report stated. GE Grid Solutions is a joint venture (JV) between GE and power engineering company Alstom.

A representative of GE Power responded to an enquiry from Energy-Storage.News asking for more details on the reported Mexico projects. She said that while GE was able to confirm the reports, there were currently no further details available to press.

The representative said the projects “are in the very early stages” and that there was no further information she could give beyond the contents of the El Financiero report.

Back in 2015, as GE entered the energy storage market for the first time, one analyst at Lux Research told Energy-Storage.News that the giant company’s involvement was indicative of the growing appeal of a rapidly maturing industry and technology set. This year in April the company then unveiled what is thought to be the world’s first battery-gas turbine hybrid system in Norwalk, California.

Meanwhile the parent group’s venture capital investment arm GE Ventures invested in Germany’s Sonnen in 2016 and GE also formed Current by GE, a clean energy, EV and energy efficiency subsidiary in 2015.  

Read Next

June 9, 2025
Daiwa Energy & Infrastructure has bought a minority stake in large-scale BESS projects from independent power producer (IPP) Enfinity Global.
June 5, 2025
Asset manager MEAG has acquired a 92.5MW/231MWh BESS in Germany, fully merchant-financed, which optimiser Entrix will trade in the electricity market.
Premium
June 5, 2025
Tim Buckley of Climate Energy Finance believes the Australian government’s new home BESS subsidy scheme will make it a ‘red-hot market’.
Premium
June 4, 2025
The Capacity Market (CM) in Germany will offer a new potential revenue stream for BESS, but not all developers and owner-operators are convinced.
June 4, 2025
A consortium of lenders, including state-owned bank Oschadbank, has agreed to Ukraine’s biggest financing for battery energy storage system (BESS) projects to date.

Most Popular

Email Newsletter