Base Power raises another US$1 billion in Series D financing for US residential BESS

LinkedIn
Twitter
Reddit
Facebook
Email

Residential energy storage startup Base Power has announced a US$1 billion Series D financing at a US$13 billion post-money valuation, and the launch of its new home battery in production in Austin, Texas, US.

Announced 3 August, Base Power is launching its 39.2kWh residential battery energy storage system (BESS) dubbed Base Core, in production at Base Factory 1 in Austin, Texas.

By comparison, Base Core’s capacity more than doubles the Tesla Powerwall 3’s 13.5kWh capacity.

Additionally, Zach Dell, CEO and co-founder of Base Power, claimed, “It installs in under an hour, switches over seamlessly, is built to handle extreme weather, and delivers extended outage protection at a price Americans can afford.”

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Base previously raised US$1 billion in Series C financing from venture capital (VC) fund Addition, in October 2025.

Since that time, the company has been growing at an impressive pace. In February 2026, Base and utility El Paso Electric Company (EPE) announced a residential distributed energy resource (DER) pilot programme, seeing Base deploy a fleet of networked residential batteries in EPE’s service region.

In March, Base announced a collaboration with another Texas utility, Denton County Electric Cooperative (CoServv), to deploy 100MW of its residential BESS across North Texas.

In June, the company expanded to Illinois, installing BESS for customers in utility ComEd’s service area.

Base claimed that through its partnerships in Texas and Illinoi, it has expanded its fleet to over 500MWh.

The Series D was led by VC and investment firms Ribbit, Addition, Valor Equity Partners, and JPMorganChase’s Strategic Investment Group, part of the firm’s Security and Resiliency Initiative, with participation from Altimeter, D1 Capital Partners, Sands Capital, Coatue, Layer Global, and Energy Impact Partners.

Base’s major existing investors are re-investing, including Thrive Capital, a16z, Lightspeed, Trust Ventures, CapitalG, and more.

The company stated that the newly raised capital will be used for expanding the company’s footprint, Base Core, and hiring.

Market research firm Wood Mackenzie’s Q2 2026 US Energy Storage Monitor, released on 23 June reported that the national attachment rate for residential BESS reached 45% in Q1 2026, up from 38% in Q1 2025 but unchanged from Q4 2025.

California, Texas, Hawaii, and Arizona saw the largest quarter-over-quarter increases in deployed storage capacity during the first quarter. However, the national residential storage market is projected to contract 5% in 2026, driven by US residential solar installer Freedom Forever’s bankruptcy, tax equity constraints, and updated permitting data indicating a sharper decline in capacity additions.

Last month, residential renewable energy solutions company Palmetto launched its Palmetto Energy Backup Plan residential battery subscription in 25 states. The plan has no upfront payment and a fixed US$150 monthly fee for 12 years. It targets an estimated 4 to 4.5 million homes that have rooftop solar but no BESS.

8 September 2026
Barcelona, Spain
Battery & Energy Storage Tech Europe (BESTE) is Europe’s industrial scaling platform for stationary and industrial battery applications — not EVs. Taking place 8–9 September 2026 at Fira de Barcelona, BESTE brings together utilities, IPPs, energy-intensive industries, data centres, ports, rail, maritime, defence and aerospace OEMs — all deploying or integrating battery storage at scale. Over 100 companies already confirmed — including EDP Renewables, Acciona, Endesa, Naturgy, Neoen, Galp, Basquevolt and Veolia — alongside 40+ expert speakers and international institutional support from BEPA, BVES, LDES and Volta Foundation. Where Europe’s battery & ES ecosystem turns projects into reality.
15 September 2026
San Diego, USA
You can expect to meet and network with all the key industry players again in 2025 from major US asset owners, operators, RTOs and ISOs, optimizers, software and analytics providers, technical consultancies, O&M technology providers and more.
15 September 2026
Berlin, Germany
Launching September 2026 in Berlin, Energy Storage Summit Germany is a new standalone event dedicated to Germany’s energy storage market. Bringing together investors, developers, policymakers, TSOs, manufacturers and optimisation specialists, the Summit explores the regulatory shifts, revenue models, financing strategies and technology innovations shaping large-scale deployment. With Germany targeting 80% renewables by 2030, it offers a focused platform to connect with the decision-makers driving the Energiewende and the future of utility-scale storage.

Read Next

August 5, 2026
Flow battery company Invinity Energy Systems has sold 43MWh of battery systems to utility Dairyland Power Cooperative for deployment across long duration energy storage (LDES) projects in the US Midwest.
August 5, 2026
AMPYR Australia has received a 5.3.4 letter from AEMO for the 270MW Northern Battery near Port Augusta in South Australia.
Premium
August 4, 2026
Energy-Storage.news Premium speaks with Mike Nagus, CEO of LiNova Energy, about the company’s recently launched “metal-free polymer cathode” battery.
August 4, 2026
Massachusetts’s Department of Energy Resources (DOER) has issued a request for proposals (RFP) for 1,000MW of energy storage in the US state.
Premium
August 4, 2026
ESN Premium speaks with Fluence’s Jeff Monday and Sam Markham on the opportunity battery energy storage could provide data centres in Australia.