Highview Power unveils plan for first 500MWh liquid air storage project in Latin America

June 11, 2021
LinkedIn
Twitter
Reddit
Facebook
Email
Rendering of a large-scale CRYOBattery LAES system. Image: Highview Power.

A joint venture (JV) partnership to develop and construct long-duration liquid air energy storage (LAES) projects at scale in Latin America has revealed plans for its first project.

Highview Enlasa, formed as a 50:50 owned JV between UK-headquartered LAES technology provider Highview Power and Chilean backup power generation company Energia Latina SA Enlasa in October 2020, is planning a 50MW / 500MWh project in Chile’s Atacama region.

Offering up to 10 hours of storage using Highview Power’s CRYOBattery technology, the system would represent investment of about US$150 million and would be placed in the city of Diego de Almagro. The CRYOBattery works by cooling ambient air until it liquifies at -196 °C (-320 ˚F). The air is then stored at low pressure until electricity is needed, at which point it is heated again to drive turbines as it expands.

Highview claims the systems can be built using relatively low-cost components that come off the shelf from other industries and could even enable people from the oil and gas industries an avenue of employment in clean energy, leaning on some of the mechanical expertise they already have. In fact the company recently selected MAN Energy Solutions, a subsidiary of Volkswagen better known for its diesel engines, to provide core turbomachinery to a 250MWh project under construction in the UK.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

Not ready to commit yet?
  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The Atacama region is one of the sunniest parts of the world and Highview Enlasa said that pairing the LAES system with solar power can enable 24/7 use of renewable energy. Chilean engineering, procurement and construction (EPC) group SK Ingenieria y Construccion has been picked out as EPC partner. The project is currently undergoing pre-feasibility engineering work ahead of environmental assessments later this summer, with construction expected to begin in the second half of 2023.

Chile is targeting 100% renewables in its electricity sector by 2050 and at least 60% by 2035 as well as committing to phasing out coal generation. Through auctions the government has supported a big build-out of large-scale solar and in 2020 already surpassed its 20% by 2025 target. The country’s first 3MW grid-scale solar project was constructed in 2012 but according to figures from Chilean renewable energy association ACER, by mid-2020 it had about 3GW of solar PV in operation and a further 3GW under construction. Also currently under construction in Chile is Latin America’s largest lithium-ion battery energy storage project so far at 112MW / 560MWh by AES Corporation.

Highview Power meanwhile is targeting the global need for long-duration bulk energy storage that it believes is coming down the line and is already here in some places. After a few years of validation of its technology including building a megawatt-scale demonstrator in England, the company is proceeding with its 50MW / 250MWh project in the UK, developing several large projects in the US and recently unveiled proposals for 2GWh split across seven projects in Spain.

Read Next

November 11, 2025
Hassan Allam Utilities and Infinity Power have signed agreements with Egypt’s Ministry of Electricity and Renewable Energy and the Egyptian Electricity Transmission Company for two renewable energy projects in the country.  
Premium
November 11, 2025
Japan’s NGK Insulators has discontinued its sodium-sulfur (NAS) battery product line, with the exit of its partner, BASF, thought to have led to the final decision.
November 11, 2025
Energy-Storage.news proudly presents our sponsored webinar with Trina Storage, on the relevance of customisation for battery storage project success in Latin America.
Premium
November 6, 2025
TotalEnergies is reportedly considering selling a stake of ‘about 50%’ in a portfolio of BESS projects in Germany it is deploying via Kyon Energy.
November 6, 2025
BlackRock-backed Akaysha Energy has secured AU$460 million (US$299 million) in construction financing for its 311MW/1,244MWh Elaine battery energy storage system (BESS) in Victoria, Australia.

Most Popular

Email Newsletter