Tesla’s battery man to give Intersolar North America’s keynote opening

LinkedIn
Twitter
Reddit
Facebook
Email

Tesla Energy Powerwall for residential use. Image: Tesla.
The opening keynote address at Intersolar North America next week will be delivered by Tesla’s chief technical officer (CTO) JB Straubel.

Straubel co-founded the EV maker with Elon Musk and sits on the board of SolarCity – again, along with Musk, who is SolarCity’s chairman. He will be joined at the opening ceremony on Monday, 13 July by other solar advocates and policymakers including the head of Fraunhofer Institute for Solar Energy, Dr. Eicke Weber, California Solar Energy Industries Association (CALSEIA) executive director Bernadette del Chiaro and New York state senator Kevin S. Parker.

While Straubel apparently oversaw the technical and engineering design of Tesla’s vehicle range, he gave a 2014 speech at a Silicon Valley event in which he admitted to being as interested in batteries as cars, if not more so. According to Intersolar North America, Straubel will be introducing Tesla Energy and its range of long-awaited stationary storage products to the solar industry. As with its European counterpart which took place in Munich in June, Intersolar North America will this year feature a greater emphasis on energy storage than before. According to the organisers, Straubel’s speech is expected to reflect this and to focus on storage’s role in enabling greater deployment of solar.

Cover image credit:Solar Promotion International GmbH.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

JB Straubel’s 2014 keynote at the 2014 Silicon Valley/SEEDZ Energy Storage Symposium.

Read Next

Premium
July 15, 2026
Some 9.1GW/33.5GWh of large-scale BESS came online globally last month, with Saudi Arabia accounting for over one-third of the figure.
July 14, 2026
Owner-operator Giga Storage has secured a €450 million (US$512 million) financing package for its 700MW/2,800MWh Green Turtle BESS project in Belgium.
Sponsored
July 14, 2026
Huawei FusionSolar’s new Smart String Grid-Forming ESS Platform, LUTERRA, is born from technology breakthroughs designed to drive customer success.
July 13, 2026
According to a leaked draft of its Electrification Action Plan, the European Union (EU) must deploy 200GW of energy storage by 2030 to meet energy system flexibility needs.
July 9, 2026
Independent power producer (IPP) Opdenergy has closed a US$227 million financing for its operating renewable energy portfolio in Chile.