Sungrow provides BESS to Verano Energy’s 606MWh Chilean hybrid project

LinkedIn
Twitter
Reddit
Facebook
Email

Independent power producer (IPP) Verano Energy has awarded the battery energy storage system (BESS) supply for its 152MW/606MWh Observatorio project to Sungrow.

Under the agreement, the Chinese PV inverter and BESS producer Sungrow will provide its PowerTitan 2 units to the project.

Located in the O’Higgins region, central Chile, the project will be hybridised with a 135MW solar PV plant, for which Sungrow is also providing its SG350HX-20 inverters. Commercial operation of the project is expected to begin in the first half of 2028.

Chilean utility Copec EMOAC will offtake the project’s electricity.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

On top of the BESS supply agreement, Sungrow will provide a 25-year long-term service agreement (LTSA), with the aim of ensuring the system’s operational availability, performance, and reliability throughout its entire service time.

According to Verano Energy, Observatorio represents a strategic project within its Chilean renewables portfolio as it incorporates energy storage as a key element to maximise the value of renewable energy generation and address the electrical system’s flexibility challenges.

“Incorporating energy storage allows us to harness the full potential of our solar resource, bring greater flexibility to the electricity system, and offer solutions that meet the needs of a market increasingly geared towards the integration of renewable energy,” said Tomás Anuch, chief operating officer at Verano Energy.

Present in Latin America, Verano Energy’s main markets are concentrated in Chile and Colombia. It has so far developed more than 60 solar PV projects with a combined capacity of 800MW+. The IPP currently has a portfolio of more than 2.5GW of renewables and over 2GWh of BESS projects at different stages of development.

In Chile, the Domeyko Solar + BESS project is at the most advanced stage and combines 83MWp solar PV with 660MWh BESS. The project recently reached a key milestone by completing the unloading and full installation of its BESS system. The Domeyko solar-plus-storage project is expected to begin commercial operations at the end of 2026, the company closed financing on the solar-plus-storage project in September 2025.

Our publisher Solar Media, part of Informa Connect, will host the Energy Storage Summit Latin America 2026 on 26-27 October, 2026, in Santiago, Chile. Energy-Storage.news readers can use our discount code ESN20 at checkout for 20% off tickets.

15 September 2026
San Diego, USA
You can expect to meet and network with all the key industry players again in 2025 from major US asset owners, operators, RTOs and ISOs, optimizers, software and analytics providers, technical consultancies, O&M technology providers and more.
15 September 2026
Berlin, Germany
Launching September 2026 in Berlin, Energy Storage Summit Germany is a new standalone event dedicated to Germany’s energy storage market. Bringing together investors, developers, policymakers, TSOs, manufacturers and optimisation specialists, the Summit explores the regulatory shifts, revenue models, financing strategies and technology innovations shaping large-scale deployment. With Germany targeting 80% renewables by 2030, it offers a focused platform to connect with the decision-makers driving the Energiewende and the future of utility-scale storage.
27 October 2026
Santiago, Chile
Energy Storage Summit Latin America brings together developers, investors, utilities and policymakers to explore how storage is advancing system stability, regulation, deployment and new revenue models across the region. With insights from Chile, Argentina, Brazil, Mexico and beyond, the Summit focuses on financing, policy clarity, hybridisation, supply chain development and project optimisation as LATAM accelerates its storage buildout.
3 November 2026
Málaga, Spain
Understanding technology and supplier selection for Europe’s utility-scale PV market in 2027. PV ModuleTech Europe 2026 is a two-day conference that tackles these challenges directly, with an agenda that addresses all aspects of PV module, inverter and battery supplier selection; product availability, technology offerings, supply chain traceability, quality assurance, factory auditing, system reliability, and supplier bankability.

Read Next

September 10, 2026
Developer SMT Energy and Software-focused energy storage system integrator FlexGen have announced the start of operations of a 160MW/320MWh energy storage facility Houston, Texas, US.
September 10, 2026
Second-life battery energy storage system (BESS) firms B2U, Moment and Rebaba are advancing project operations in Texas, US compliance, and new financing in Europe, respectively.
September 10, 2026
Akaysha Energy’s Waratah Super Battery in Australia briefly reached its full rated output of 850MW on 7 September.
September 10, 2026
The venture-capital-style returns once available in Australia have disappeared, according to panellists at the Battery Asset Management Summit Australia 2026.
September 9, 2026
Utility Black Hills Energy has announced it will move forward with the construction of a 50MW/200MWh energy storage facility at its Pueblo Airport Generating Station (PAGS) in Colorado, US.