Philippines: Aboitiz Power breaks ground on 48MW hybrid BESS at oil-fired power plant

April 23, 2025
LinkedIn
Twitter
Reddit
Facebook
Email

Philippines power generator and utility Aboitiz Power, via its subsidiary Therma Marine Inc (TMI), has broken ground on the development of a 48MW hybrid battery energy storage system (BESS) at a floating oil-fired power plant in Agusan del Norte.

The 48MW Nasipit hybrid BESS will be integrated into the TMI Mobile 2 oil-fired power facility, a type of floating power barge situated in Nasipit Bay, west of the Municipality of Nasipit.

According to Aboitiz Power, integrating a BESS will help the facility play a “crucial role in providing fast, responsive power to help balance supply and demand in the grid as an ancillary service.”

This is increasingly important on island grids like Mindanao’s, where the facility is based.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

TMI is a subsidiary of Aboitiz Power, a generator, distributor, and retailer of electricity in the Philippines from a portfolio of hydroelectric, solar PV, and thermal power plants.

The floating power facility was built in 1994 to provide flexible, on-demand power. Its older brother, the TMI Mobile 1 oil-fired power plant in Maco, Davao de Oro, built in 1993, is also home to a 49MW hybrid BESS, which entered commercial operations in 2022.

The TMI Mobile 1 project integrates a BESS provided by Finnish energy tech firm Wärtsilä with a 100MW diesel-powered floating power plant in Maco on Mindanao run by Therma Marine. The BESS reduces the power barge’s ramping time from 15 to three minutes.

It is hoped the BESS located at the TMI Mobile 2 facility will come online in the second quarter of 2026.

Ronaldo Ramos, AboitizPower Transition Business Group chief operating officer for Operated Assets, said the smart solution will “help enable more grid stability and support the growing share of renewable energy in our grid.”

Representatives from the local governments of Agusan del Norte, led by Governor Maria Angelica Rosedell Malbas Amante and Nasipit Mayor Roscoe Democrito Borja Plaza, attended the groundbreaking event.

Aboitiz Power has undertaken several projects that appear to bridge legacy power systems with renewable energy and energy storage capabilities in the Philippines. One of these includes the 24MW Magat BESS in Ramon, a municipality in the district of Isabela.

The battery is co-located with the 388MW Magat Hydroelectric Power Plant in the north of the Philippines’ largest island, Luzon. It started participating in the reserve market in January 2024.

The hydroelectric plant is owned by SN Aboitiz Power (SNAP), a clean energy joint venture (JV) formed between the power generation, retail, and distribution holding company Aboitiz Power and the Norwegian renewable energy systems developer Scatec. The JV plans to develop 12 BESS projects nationwide, providing frequency regulation and contingency reserves. 

DOE launches renewables-plus-storage auction

In more recent news in the Philippines, Energy-Storage.news reported in March 2025 that the government Department of Energy (DOE) had opened the initial steps of an auction scheme for renewables paired with energy storage.

In what had been deemed a “much-anticipated” scheme, the Southeast Asian country’s government will tender for 9,378MW of renewables, comprising distributed and large-scale solar PV, including ground-mount, rooftop and floating PV, alongside onshore wind capacity.

The Philippines experienced a notable surge in BESS installations a few years ago, as large power producers, compelled by the top-down regulated energy market to provide ancillary services, incorporated battery storage to enhance the efficiency of delivering these services from their existing thermal power fleets.

The country aims for a 35% share of electricity from renewable sources by 2030, increasing to 50% by 2040, with a steady rise in share beyond that point, as outlined in the Philippines Energy Plan 2023-2050.

24 February 2026
InterContinental London - The O2, London, UK
This isn’t just another summit – it’s our biggest and most exhilarating Summit yet! Picture this: immersive workshop spaces where ideas come to life, dedicated industry working groups igniting innovation, live podcasts sparking lively discussions, hard-hitting keynotes that will leave you inspired, and an abundance of networking opportunities that will take your connections to new heights!

Read Next

November 28, 2025
The Australian government has officially opened CIS Tender 8, targeting 16GWh of energy storage capacity across the NEM.
November 27, 2025
The Western Australian government has launched the first stage of an Expression of Interest (EOI) process for a 50MW/500MWh vanadium flow battery energy storage system (VBESS) in Kalgoorlie.
Premium
November 26, 2025
Energy-Storage.news Premium speaks with Michael Kirschner, Managing Director, US, for Habitat Energy, about optimising BESS projects in ERCOT.
November 26, 2025
Potentia Energy has received federal environmental approval for its 1,000MWh Tallawang Solar Hybrid project, and Fluence has delivered its Gridstack battery energy storage equipment to Ampyr Australia’s 600MWh Bulabul Battery installation.
Sponsored
November 26, 2025
As Australia accelerates its transition toward renewables, demand for reliable & sustainable energy storage solutions has never been higher.