Australia’s New South Wales has seen 532MW of firming projects contracted through its seventh infrastructure tender, securing two projects designed to strengthen electricity supply during periods of peak demand and system stress in the Sydney-Newcastle-Wollongong region.
The Japanese association of grid operators has selected 19 battery storage projects totalling 1,251MW in the third running of a national capacity market auction.
We caught up with the CEO of owner-operator BW ESS, Erik Strømsø, about the firm’s next deployment plans, tolling trends, procurement and LDES, with its 11.5-hour Bannaby BESS in Australia further proof of lithium-ion’s long-duration potential.
Chinese industrial automation and power technology firm Inovance Technology has filed its prospectus with the Hong Kong Stock Exchange, planning to raise around US$2 billion (RMB 13.7 billion) following strong growth in its energy storage business.
Yarra Energy Foundation (YEF), a not-for-profit organisation, has commissioned a community battery storage system and two wheelchair-accessible electric vehicle (EV) charging bays in Clifton Hill, an inner-city suburb of Melbourne, Australia.
Swedish independent power producer (IPP) OX2 has confirmed it has started construction activities at the 100MW/300MWh Muswellbrook solar-plus-storage site in New South Wales (NSW), Australia.
Australian energy storage developer Enervest has acquired the Northern Border Battery, a 300MW battery energy storage system in development, from an unnamed Sydney-based developer.
Two battery energy storage system (BESS) companies, Eos Energy and ESS Tech Inc, are betting big on the US adoption of long-duration energy storage (LDES) in Q1 2026 financial reports.
Spanish developer and independent power producer (IPP) Zelestra has energised its 1GWh battery energy storage system (BESS) in the Atacama Desert in Chile.
The “vast majority” of issues identified in Intertek CEA’s 2025 audits were system-level defects that could pose risks to projects if undetected and unresolved.