PODCAST: Coronavirus contingencies, BP’s net zero plans and the re-expansion of CfDs

By Solar Media Staff
March 5, 2020
LinkedIn
Twitter
Reddit
Facebook
Email
Clenergy’s floating solar solution developed for the Japanese market at PV Expo, Tokyo, 2020. Image: Andy Colthorpe / Solar Media.

In this month’s episode of the Solar Media Podcast, Liam Stoker and Andy Colthorpe discuss how the clean energy economy is responding to the coronavirus, while Andy reports from PV Expo in Tokyo, which itself felt the effects of the virus outbreak.

Meanwhile, Liam explores what the return of solar and other established renewables to the UK’s Contracts for Difference process means, and we hear about how the UK’s COP26 preparations are taking place across the globe. BP’s net zero plans are also up for discussion, as is Jeff Bezos’ climate fund.

The podcast can be streamed below:

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Alternatively, you can subscribe and listen to the podcast on the Solar Media Editor’s Channel, which is now on all popular audio channels, including;

· Apple Podcasts

· Spotify

· Google Podcasts

Read Next

Premium
January 22, 2026
Saudi Arabia and the UAE have emerged as two of the world’s most prominent energy storage markets, with mega-scale projects announced and moved forward at a staggering pace over the last two years. But what does the next phase look like?
January 19, 2026
FranklinWH and ConnectDER have had their respective battery and electric meter technologies enrolled into programmes in Arizona expected to accelerate the take-up of home batteries for virtual power plants (VPPs).
January 16, 2026
Duke Energy, Elevate Renewables, and Fluence Energy, along with BrightNight and Cordelio Power, are advancing BESS projects across the BESS.
January 15, 2026
ASL has launched a consultation on a new Hybrid Generation LTESA product alongside its 2026 NSW Consumer Trustee Investment Priorities.
January 15, 2026
While coal and gas power plants grapple with cost increases, Australia’s battery storage sector delivers a different story, with costs plummeting across all durations.