Australian farm to benefit from Neoen’s ‘Green Power Hub’ that includes 34MWh battery

LinkedIn
Twitter
Reddit
Facebook
Email
Victoria Premier Daniel Andrews (right) talks to farm workers. Image: Premier of Victoria’s office.

An agricultural business in Victoria, Australia, is making its operations sustainable with the building of a major “green hub” that includes wind turbines and 34MWh of battery energy storage.

Nectar Farms in Western Victoria is expanding its production footprint significantly with a project worth around AUS$565 million (US$430 million), potentially creating 1,300 jobs. The office of Daniel Andrews, Victoria’s Premier, announced via a statement this morning that Andrews had signed a Memorandum of Understanding (MoU) with Nectar Farms at an event for the project also attended by Victorian Minister for Energy, Environment and Climate Change, Lily D’Ambrosio MP.

“This project will make Stawell Nectar Farms the world’s first ever protected crop farm completely powered by renewable energy. It’s great for jobs, great for our environment and great for Victoria,” Daniel Andrews said.

Nectar Farms is currently creating a 10 hectare development including hydroponic greenhouses as Stage 1 of its expansion. Stage 2, worth around AUS$215 million of the total, will develop a further 30 hectares and create as many as 500 jobs, around 300 of them permanent.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Green Power Hub to be created

Centrepiece of the new construction is a 196MW wind farm at Bulgana Green Power Hub, using 56 turbines at a cost of AUS$350 million, creating 800 construction-related jobs and around 20 permanent ones. Alongside the wind turbines will be a 20MW / 34MWh lithium-ion battery energy storage system which will enable the whole system to deliver sustainable “baseload” power to Nectar Farms’ operations.

Prior to the announcement of the project and signing of the MoU, Nectar Farms’ expansion plans had to be put on hold due to rising costs of energy and insecurity of supply, the local government for North Grampians Shire Council revealed.

“What Nectar Farms needed was surety of supply at a competitive price. This agreement gives them that,” Northern Grampians Shire Council Mayor Tony Driscoll said.

The Australian subsidiary of French renewable energy developer Neoen signed up for the project with Premier Andrews and Nectar Farms. Under terms agreed between the parties, Nectar will take 10% of the energy from the Bulgana Green Power Hub, with the other 90% going straight into the local grid.

Read Next

June 5, 2026
Akaysha Energy’s Waratah Super Battery is now operating at 700MW and 1,680MWh following the successful return to service of High Voltage Transformer 2 (HVT2), the BlackRock-backed developer confirmed in a market update today (4 June).
June 5, 2026
Australia’s Victorian government has approved four new energy projects worth a combined AU$2.4 billion via its DFP, including 1,390MW of BESS.
June 4, 2026
Recharge Power, a Taiwanese battery energy storage system (BESS) developer and integrator, has signed a strategic cooperation agreement with Australian renewable energy developer Energy Decarb to establish a joint venture targeting the Australian solar PV and battery storage market.
June 3, 2026
Akaysha Energy’s 415MW/1,660MWh Orana BESS has reached full output, with the facility now listed as operating in Australia’s NEM.
June 3, 2026
Queensland Investment Corporation has opened a formal call for proposals under the state government’s AU$200 million North West Energy Fund.