Iron-air US LDES startup Form Energy secures US$750 million Series G financing

LinkedIn
Twitter
Reddit
Facebook
Email

US startup Form Energy has secured a US$750 million Series G financing round led by global investment management firm T. Rowe Price.

Announced 12 August, Form said the proceeds from the Series G will be used to accelerate its manufacturing scale-up through its first factory, called Form 1, in Weirton, West Virginia, and advance commercial deployments of its iron-air “multi-day” battery energy storage systems (BESS).

T. Rowe Price previously led Form’s Series F round, the Series G brings the company’s total equity raised to over US$2 billion.

New investors in the Series G included Sequoia Capital, Janus Henderson, Franklin Templeton, and PEAK6 Investments.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The round also received continued support from existing investors including Prelude Ventures, Engine Ventures, TPG Rise Climate, Capricorn’s Technology Impact Funds, Breakthrough Energy Ventures, Facebook and Meta co-founder Dustin Moskovitz and his wife, philanthropist Cari Tuna, Gigascale Capital, Coatue, Energy Impact Partners, NGP, GE Vernova, Blindspot Ventures, and M&G Catalyst Fund.

Notably, when Form first emerged, it was widely considered to be in a category of one, with its iron-air long-duration energy storage (LDES) technology. While the company is thought to hold extensive patents and IP for its proprietary battery, other iron-air battery startups have emerged.

India-headquartered Meine Electric claims it is “APAC’s first iron-air LDES innovator” and recently announced a pilot project at the Simhadri Thermal Power Station, owned by NTPC, India’s biggest electric power utility.

Dutch iron-air startup Ore Energy raised US$43 million in a Series A funding round earlier this month. As with Form Energy’s battery, Ore’s technology works by essentially rusting and derusting metal.

Axios reported that Form’s Series G funding round was completed at a US$1.75 billion pre-money valuation. That valuation is down “from a roughly US$3 billion pre-money valuation achieved during its previous fundraising cycle in October 2024, reflecting a down round despite strong commercial momentum.”

Form’s recent activity

The company noted its recent commercial agreements and increase to its backlog from approximately 20GWh to 80GWh.

In February, utility Xcel Energy announced it would install 30GWh of Form Energy’s iron-air batteries at a data centre in Minnesota belonging to Google.

The next month, Form signed a 12GWh supply agreement in the US with AI data centre infrastructure developer Crusoe.

It also announced in March, an agreement to jointly deploy a 10MW/1,000MWh iron-air BESS in the northwest of Ireland with developer FuturEnergy Ireland.

Form Energy stated that in order to support its growth, it expanded its executive leadership team, appointing chief financial officer Navneet Govil and chief operating officer Wes Sloan.

Battery Asset Management Summit USA 2026 will be held 15-16 September in Garden Grove, California, hosted by Energy-Storage.news publisher Solar Media (part of the Informa Group). The agenda emphasises addressing the roles of AI, cybersecurity, and second-life applications, broken down into two tracks: Technical Asset Management and Commercial Asset Management. This year, the conference is also co-located with Solar & Storage Finance Summit USA. Visit the official site for more details.

3 November 2026
Málaga, Spain
Understanding technology and supplier selection for Europe’s utility-scale PV market in 2027. PV ModuleTech Europe 2026 is a two-day conference that tackles these challenges directly, with an agenda that addresses all aspects of PV module, inverter and battery supplier selection; product availability, technology offerings, supply chain traceability, quality assurance, factory auditing, system reliability, and supplier bankability.

Read Next

October 19, 2026
New Zealand energy storage company ArcActive has switched on a pilot lead-acid BESS in Victoria, Australia, with support from Origin Energy.
October 16, 2026
US energy storage developer Flatiron Energy has closed on approximately US$850 million for its 1,200MWh Energizar energy storage project in Chelsea, Massachusetts, US.
October 16, 2026
VSL PowerHive, a Vikram Solar subsidiary, announced a 7.5GWh BESS assembly plant in Oragadam, near Chennai, Tamil Nadu.
October 15, 2026
Energy storage owner-operator Nightpeak Energy has reached financial close and commercial operation on its 150MW/300MWh Bocanova 2 battery storage project in Brazoria County, Southeast Texas.
October 15, 2026
From the Midwest to New York, local and state governments are introducing new zoning rules and restrictions on BESS and data centre projects.