EDF signs 20-year solar PPA with BESS option for Southern California Public Power Authority

By Will Norman
March 24, 2023
LinkedIn
Twitter
Reddit
Facebook
Email

EDF Renewables North America has signed a 20-year power purchase agreement (PPA) with the Southern California Public Power Authority (SCPPA) for its 117MW solar PV project in Riverside County.

The Sapphire Solar project is set to come online by the end of 2026 and will supply power to the cities of Anaheim, Pasadena and Vernon through their participation in SCPPA. The agreement also contains an option for SCPPA to access a 236MWh battery energy storage system.

“Sapphire Solar will supply 117 MWac of solar capacity and a 59MWac/236 MWh battery energy storage system (BESS) to our growing renewable and energy storage resource mix,” said Michael Webster, executive director of SCPPA. “This project will help our Participating SCPPA Members meet and exceed renewable energy and resource adequacy requirements, while at the same time minimising costs and maintaining reliability.”

EDF renewables – a subsidiary of France’s state-owned EDF Group – has developed over 16GW of solar, storage and wind projects in the US. It recently signed a virtual PPA with McDonald’s for its 332MW Texas solar facility.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

Not ready to commit yet?
  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

In California, the company connected a 475MW solar-plus-storage project to the grid last August, located on public land. The Sapphire Solar project will be situated on private land.

Riverside County also hosts EDF Renewables’ Desert Harvest I solar project which became operational in 2020. Solar plays a big role in California’s energy generation and transition framework, and will have to continue being installed at record rates if the state is to meet its targets over the next quarter-century.

This story first appeared on PV Tech.

Read Next

Premium
November 19, 2025
An energy storage agreement (ESA) between Toronto, Ontario-headquartered developer Hydrostor and California community choice aggregator (CCA) Central Coast Community Energy (3CE) is set to be amended for the third time. 
November 19, 2025
Solar Energy Corporation of India (SECI) has agreed on BESS and hybrid solar developments with the Government of Andhra Pradesh.
November 18, 2025
US residential solar and energy storage installer Sunrun has posted revenue of US$724.6 million in the third quarter of this year, as the company implements its “storage-first strategy”.
Premium
November 14, 2025
The US development arm of Milan, Italy-headquartered developer Nadara has encountered a setback in its pursuit of a 200MW hybrid BESS destined for Arizona.
November 13, 2025
Critical minerals manufacturer and lithium-ion battery recycling company American Battery Technology Company (ABTC) has been selected to recycle batteries from the Moss Landing Energy Storage Facility in Monterey County, California, US.