EDF signs 20-year solar PPA with BESS option for Southern California Public Power Authority

By Will Norman
LinkedIn
Twitter
Reddit
Facebook
Email

EDF Renewables North America has signed a 20-year power purchase agreement (PPA) with the Southern California Public Power Authority (SCPPA) for its 117MW solar PV project in Riverside County.

The Sapphire Solar project is set to come online by the end of 2026 and will supply power to the cities of Anaheim, Pasadena and Vernon through their participation in SCPPA. The agreement also contains an option for SCPPA to access a 236MWh battery energy storage system.

“Sapphire Solar will supply 117 MWac of solar capacity and a 59MWac/236 MWh battery energy storage system (BESS) to our growing renewable and energy storage resource mix,” said Michael Webster, executive director of SCPPA. “This project will help our Participating SCPPA Members meet and exceed renewable energy and resource adequacy requirements, while at the same time minimising costs and maintaining reliability.”

EDF renewables – a subsidiary of France’s state-owned EDF Group – has developed over 16GW of solar, storage and wind projects in the US. It recently signed a virtual PPA with McDonald’s for its 332MW Texas solar facility.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

In California, the company connected a 475MW solar-plus-storage project to the grid last August, located on public land. The Sapphire Solar project will be situated on private land.

Riverside County also hosts EDF Renewables’ Desert Harvest I solar project which became operational in 2020. Solar plays a big role in California’s energy generation and transition framework, and will have to continue being installed at record rates if the state is to meet its targets over the next quarter-century.

This story first appeared on PV Tech.

Read Next

August 11, 2025
A 535MW fleet of aggregated household battery storage systems, including Tesla Powerwalls, effectively reduced net load on the California grid in a recent test event.  
Sponsored
August 11, 2025
One of the world’s major players in solar PV is also becoming a well-known name in the energy storage system (ESS) space.
August 7, 2025
Optimisation platform provider Ascend Analytics and EPC firm SolarMax Technologies have announced battery storage projects by clients and partners in Texas’ ERCOT market.
August 7, 2025
Energy storage developer and system integrator Energy Vault has received approval to pursue market-based participation in the California Independent System Operator (CAISO) with the Calistoga Resiliency Centre (CRC).
August 7, 2025
AES Andes, part of the US-based energy giant AES, has launched construction on two hybrid renewables-plus-storage projects in Chile with 2.2GWh of co-located BESS.

Most Popular

Email Newsletter