DTEK enlists Fluence for 200MW/400MWh of grid-supporting BESS in Ukraine

January 14, 2025
LinkedIn
Twitter
Reddit
Facebook
Email

System integrator Fluence will provide 200MW/400MWh of BESS for independent power producer (IPP) DTEK’s projects in Ukraine.

The battery energy storage system (BESS) equipment will go towards projects that DTEK won ancillary service contracts for with the transmission system operator (TSO) of Ukraine, Ukrenergo, in September 2024.

The projects were awarded amidst a period of heavy aerial attacks on the country’s critical grid infrastructure by Russia, and DTEK said at the time that BESS was pivotal to the ‘decentralisation of Ukraine’s energy system and ending Russia’s energy terror’.

The 200MW/400MWh of capacity will be spread across six projects, ranging from 20-50MW, which the companies need to complete by October 2025 in order to help mitigate against power grid outages during the 2025/26 winter season. They are being developed by DTEK subsidiary DTEK Renewables.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

Not ready to commit yet?
  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The BESS will provide frequency and power balancing services and will be equipped with grid-forming capabilities, which would enable services like inertia and black start (although these were not specified in the announcement). They are part of DTEK’s #FightforLight campaign, which aims to keep power online during extreme conditions of war.

DTEK’s energy storage lead Vadym Utkin discussed the projects at Solar Media’s Energy Storage Summit Central Eastern Europe (CEE) 2024 in Warsaw, shortly after the contract awards with Ukrenergo.

Energy storage is seen more widely as a way to help Europe solve the energy crisis which started with Russia’s invasion of Ukraine in 2022, as stated later that year by the European Commission’s VP Maroš Šefčovič.

Fluence has track record in the CEE region, and nearby, particularly on TSO-led projects, having deployed 200MW of storage-as-transmission projects in Lithuania and numerous TSO and non-TSO projects in Germany.

Distributed BESS projects in Ukraine to help mitigate against power outages are also being developed via a partnership between the State Agency on Energy Efficiency and Energy Saving of Ukraine (SAEE) and Norwegian LFP gigafactory firm Morrow Batteries, announced in August last year.

DTEK is also active in BESS in neighbouring Poland, acquiring a 133MW project from developer Columbus Energy last year.

2 December 2025
NH Collection Vittorio Veneto, Rome, Italy
Across two packed days, the Summit focused on three core themes: revenue & trading, the lifecycle of the battery, and optimisation tools. Attendees explored innovative strategies for enhancing asset performance and longevity, with a spotlight on key markets like Germany, Italy, and the UK. Stay tuned for details on the 2025 edition of the Battery Asset Management Summit Europe, where we’ll continue to chart the path forward for energy storage asset management.
24 February 2026
InterContinental London - The O2, London, UK
This isn’t just another summit – it’s our biggest and most exhilarating Summit yet! Picture this: immersive workshop spaces where ideas come to life, dedicated industry working groups igniting innovation, live podcasts sparking lively discussions, hard-hitting keynotes that will leave you inspired, and an abundance of networking opportunities that will take your connections to new heights!

Read Next

November 4, 2025
A double header of Baltic BESS news, with financing secured for two large-scale BESS projects in Estonia and Lithuania’s capex support scheme oversubscribed by 2x.
November 4, 2025
Marie Cullen, head of procurement at Fluence Australia, explains how social licensing could become a key component for the future of energy storage developments.
November 3, 2025
From August 2026, energy storage projects in France will benefit from changes to grid tariffs designed to encourage them to support the grid at specific times of the day.
October 31, 2025
Lithium-ion OEM Envision Energy has launched its latest grid-scale BESS solution, a 10-foot modular DC block which can be combined into configurations of 12MWh or more.
October 30, 2025
Power firm RWE has launched construction on a 400MW/700MWh BESS project in Bavaria, Germany, the largest being built in the country.

Most Popular

Email Newsletter