Younicos, Panasonic and utility Xcel Energy partner on solar storage system in Denver

November 1, 2016
LinkedIn
Twitter
Reddit
Facebook
Email

The system will be developed at the operations hub for Panasonic Enterprise Solutions Company and Panasonic CityNOW in Denver. Image: Panasonic
Energy storage system integrator Younicos has signed off on a deal with Panasonic to design and develop a solar-plus-storage system at Peña Station NEXT in Denver, Colorado, which includes the operations hub for Panasonic Enterprise Solutions Company and Panasonic CityNOW.

The installation will utilise multiple Younicos Y.Cubes, a “storage-in-a-box” solution for C&I applications from the German-American industry company. Y.Cube includes power conversion system and DC battery block, with controls embedded in the power conversion system. The systems are available in 250kVA to 500kVA configurations.

The project will see four Y.Cubes installed at the Panasonic facility in Denver, Colorado. The 1MW storage system, which will be connected to Xcel Energy’s power grid, will offer frequency regulation, solar grid integration through ramp control, grid peak shaving, passive energy arbitrage, and backup power. This system will allow Panasonic and other microgrid stakeholders to gain maximum energy yield from Xcel Energy’s 1.6 MW solar PV system located on a nearby parking structure, along with 259 kW of PV on the building’s rooftop.

Jamie Evans, managing director of the energy solutions group at Panasonic Enterprise Solutions Company, said: “The solar-plus-storage microgrid is an anchor, not just of Panasonic’s new Denver operations hub, but also for the broader Peña Station NEXT development, which is a 400-acre, smart and sustainable transit-oriented development in Denver. We are excited to partner with Younicos and Xcel Energy to bring this innovative project to life.”

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

Not ready to commit yet?
  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Younicos Y.Cube storage system. Image: Younicos.

Read Next

Premium
October 24, 2025
San Diego Gas & Electric (SDG&E) is seeking regulatory approval to acquire an operational portion of a BESS facility located in Imperial County, California, from the US development arm of German multinational energy company RWE. 
Premium
October 24, 2025
New company Lunas Energy has launched an offer for solar PV plant operators in Spain to deploy BESS on their land, as the sector struggles with curtailment and negative pricing.
October 22, 2025
It has become harder to finance BESS projects in the US, according to Ronak Maheshwari, a director at CRC-IB.
October 22, 2025
Recurrent Energy has closed a construction financing for an energy storage project in Arizona. Meanwhile, Cypress Creek Renewables has reached financial close for its solar-plus-storage project in Colorado.
October 21, 2025
A flurry of BESS news from companies operating across Germany and the Netherlands, with utility Lichtblick launching construction on a 470MWh project in Saxony, Giga Storage inaugurating a project in Amsterdam, and cross-border BESS platform Return raising €300 million.

Most Popular

Email Newsletter