UK Infrastructure Bank, Centrica to invest up to £265 million in energy storage

By John Lubbock
LinkedIn
Twitter
Reddit
Facebook
Email

The UK Infrastructure Bank plans to invest up to £265 million (US$331.45 million) in energy storage development in the UK, in partnership with British Gas owner Centrica Plc.

In a statement, Centrica said: “The Bank will invest £75 million on a match funding basis into the Gresham House Secure Income Renewable Energy & Storage LP (SIRES) alongside a £65 million investment from Centrica.”

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Another part of the deal will see the UK Infrastructure Bank invest £125 million of match funding into Equitix UK Electricity Storage Fund.

Centrica said it was the Bank’s first investment in electricity storage, and “could facilitate around 1300 jobs and will unlock at least a further £200 million in match-funded private sector capital.”

The Equitix UK Electricity Storage Fund is a UK-based, infrastructure specialist asset manager, which will “focus on a combination of innovative business models across both short and long duration storage”, according to the UK Infrastructure Bank.

The Bank said that the fund would aim to deploy both short duration solutions like household and commercial battery storage systems, as well as long duration technologies like “pumped-hydro, a type of energy storage that uses water reservoirs at different elevations to generate and store electricity. The fund is expected to facilitate 900 jobs across the UK.”

The UK added the most battery storage of any European nation in 2022 according to consultancy LCP Delta,

To read the full version of this story, visit Solar Power Portal.

Read Next

May 8, 2025
7.15GW of renewables and energy storage projects have been granted access rights to connect to Australia’s first REZ in Central-West Orana.
Premium
May 7, 2025
The pipeline of grid-scale BESS projects with planning approval in the UK has now reached 58,270MW/121,645MWh in capacity.
May 5, 2025
Stem Inc. had a profitable Q1, as pivot away from battery storage hardware into energy storage and solar software and services continues. 
Sponsored
May 1, 2025
The growing complexity of managing battery-based assets requires top-level innovation you can trust, explains Abdelkrim Benamar, CEO of PowerUp.
May 1, 2025
UK power generation firm Drax will not bid its Cruachan II pumped hydro energy storage (PHES) project into the LDES cap and floor scheme, saying that costs have risen while ‘recoverability of capital’ is unclear.

Most Popular

Email Newsletter