Tesla reports significant quarterly and full-year increase in energy storage deployments

February 1, 2021
LinkedIn
Twitter
Reddit
Facebook
Email
Tesla made more than half of the company’s highest ever yearly tally of 3,022MWh of stationary energy storage deployments in the final quarter of 2020. Image: Solar Media.

Tesla reported a significant increase in energy storage deployments for the fourth quarter of 2020, more than doubling record figures from the previous quarter as battery manufacturing expansions led to greater product availability but demand still outstrips supply.

The company reported record energy storage system (EES) deployments of 1,584MWh in the fourth quarter of 2020, up from the previous quarter, which had been a new record for the company of 759MWh. Utility-scale storage systems have been key to significant growth, although residential demand was also increasing.

Full-year ESS deployments reached 3,022MWh, compared to 1,651MWh in 2019, an increase of over 82% year-on-year.

In the earnings call, Elon Musk, CEO of Tesla noted that overall battery capacity target (used for both EVs and ESS) in 2022 was 200GWh, stating that the company could probably “achieve 30% of targeted design capacity in 2022.”

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The company had stated in its investor letter that ESS deployment demand and available supply in 2021 could result in similar growth rates seen in 2020.

Residential solar installs also jumped, rising from 57MW in Q3 2020 to 86MW in the final quarter of the year. It marks a significant jump on the 27MW deployed in Q2 2020, a performance largely attributed to the effects of the COVID-19 pandemic, and is the highest quarter of deployment since Q3 2018, when deployments topped 93MW.

To read the full version of this story, visit PV Tech.

Image: Solar Media.

Read Next

March 5, 2026
Developer Avantus has closed a financing package of over US$300 million for the 100MWac/130MWdc solar, 400MWh BESS Kitt Solar and Energy Storage Project in Pinal County, Arizona, US.
March 5, 2026
From Texas, US, Bimergen Energy has acquired eight BESS projects totalling 79.2MW. Meanwhile, Habitat Energy announced its first US co-located solar-plus-storage partnership with Birch Creek.
March 3, 2026
3.6GWh of solar-plus-storage developments have progressed in Australia this week, with Edify Energy partnering with DT Infrastructure and Flow Power acquiring a 60MW project.
March 3, 2026
Oregon-based utility company Portland General Electric has finalised agreements for more than 1,000MW of new renewable energy and BESS projects.
March 3, 2026
A number of Chinese energy storage companies have released their 2025 annual earnings results and forecasts, revealing divergent performance.