September deadline for San Diego Water Authority’s pumped hydro RFP

July 19, 2017
LinkedIn
Twitter
Reddit
Facebook
Email
An existing pumped hydro facility in North Carolina. Image: Duke Energy.

Potential developers for a 500MW pumped hydropower energy storage facility at a reservoir in San Diego have until mid-September to respond to a request for proposals (RfP).

Energy-Storage.News reported back in late April that San Diego Water Authority was gauging interest from industry in executing the vast project, which would net revenues that could lower water rates for consumers in California, while assisting in the integration of renewables, particularly solar PV. The project would be jointly owned by the Water Authority and the City of San Diego, which owns the site where the facility would be built.

The project to aid the drought-plagued region would be at the San Vicente Reservoir, with energy storage duration of between 5-8 hours. A new, smaller reservoir would be built uphill from San Vicente, with water pumped up to it during the day and released back down at night or during peak demand periods, providing energy for a cost of next to nothing as the running water runs turbines.

The RFP, which must be responded to by 12 September 2017, requires applicants to give details of their project teams, including their qualifications to undertake such a project. San Diego Water Authority will examine proposals in autumn and winter. Negotiations with a potential full-service team should begin by the end of this year, the Water Authority said. Anyone with questions about the RFP should get them in by 29 August.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The RFP can be viewed here.

Read Next

Premium
November 24, 2025
The low prices and strict operational requirements in Italy’s recent MACSE auction for BESS have brought asset management and operational execution into the spotlight.
November 21, 2025
The development of data centres has emerged as a possible lifeline for ongoing projects in the battery energy storage system (BESS) industry.
Premium
November 21, 2025
The Community Development and Infrastructure Department at Santa Cruz County has become the latest California jurisdiction to publish a draft zoning ordinance regulating the deployment of battery energy storage systems. 
November 20, 2025
From the US, Maxwell Technologies is acquired for its third time, by Clarios, Fullmark Energy completes a tax credit transfer, and OATI partners with Colville Tribes on microgrid solutions.
Premium
November 19, 2025
An energy storage agreement (ESA) between Toronto, Ontario-headquartered developer Hydrostor and California community choice aggregator (CCA) Central Coast Community Energy (3CE) is set to be amended for the third time.