NEC’s 2MW project marks first step into energy storage business for Engie in Chile

LinkedIn
Twitter
Reddit
Facebook
Email
NEC ES will deliver the Chile project, along with NEC Chile. Image: NEC ES

Multinational energy company Engie Group has contracted NEC Energy Solutions and NEC Chile to provide a 2MW / 2MWh energy storage system to its subsidiary Engie Energia Chile in Latin America.

The project will be NEC Chile’s first smart energy project and was awarded to the company last week through a competitive solicitation process, it was announced on Tuesday. While NEC Energy Solutions has executed two other energy storage projects in Chile already, totalling 32MW, it will be Engie’s first energy storage system in the country and follows news from last month that the France-headquartered group’s Brazil operations will be trialling the use of a grid-scale zinc hybrid cathode battery system from Eos.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The project is the first step in the establishment of an energy storage business, Engie Energie Chile’s general manager Axel Leveque said, “in line with the change of the business strategy of the ENGIE group to invest less in traditional generating technologies and focus mainly on renewable energy”.

“This project aims precisely in that direction and for its development we have chosen one of the most experienced companies in the world,” Leveque said.

The Chile system will be installed in Arica, in the north of the country. With its relatively short duration of storage in the system, it will be used to provide ancillary services to the grid, including spinning reserve and time shifting and will help integrate solar and wind energy resources. It will be connected to an existing substation.

The system, to be supplied by NEC Chile in conjunction with NEC Energy Solutions, will be based around NEC ES’ Grid Storage Solution (GSS), a modular, factory-built AC-ready energy storage system. It utilises lithium-ion batteries with NEC ES’ power conversion system and the company’s proprietary AEROS controls system.

The project will be executed in the second half of this year. NEC Chile’s head of business development for smart energy in Latin America, Herwig Ragossnig, said he hoped this would be the “first step for a long lasting cooperation for the development of energy storage projects”. According to Chile’s renewable energy association, ACERA, the country is expected to add 1.5GW of new renewable energy generation capacity during 2017.

Download a free Whitepaper from NEC ES: “Comparing the upfront costs of energy storage”.

Read Next

May 13, 2025
Intensifying competition and unpredictable market conditions in the BESS sector increase the need for robust forecasting and optimisation strategies.
May 8, 2025
7.15GW of renewables and energy storage projects have been granted access rights to connect to Australia’s first REZ in Central-West Orana.
May 7, 2025
Europe breaking battery storage deployment records, but more still needs to be done to accelerate uptake, according to SolarPower Europe.
May 6, 2025
The Labor Party, led by Anthony Albanese, has secured a landslide victory in the 2025 Australian federal election.
Premium
May 2, 2025
We hear from industry sources about the upcoming Real-Time Co-Optimization Plus Batteries (RTC+B) market changes in ERCOT, Texas, and why they represent a fundamental shift in how BESS will operate in one of the world’s largest and most lucrative energy storage markets.

Most Popular

Email Newsletter