IRP from PacifiCorp picks battery storage as part of a “least-cost portfolio” for the first time

October 8, 2019
LinkedIn
Twitter
Reddit
Facebook
Email
PacifiCorp coal-fired generation facility in Utah. Image: Wikimedia / Tricia Simpson.

PacifiCorp has formalised a long-anticipated shift from coal to solar, wind and battery storage, setting ambitious targets underpinned by a belief in clean energy’s sound economics.

The utility, a subsidiary of Warren Buffett’s Berkshire Hathaway Energy, recently unveiled a roadmap that would see it add nearly 3GW of new solar by 2025 and 6.3GW by 2038.

The firm’s “preferred portfolio” would also feature a major wind roll-out – with 4.6GW in new capacity installed by 2038 – and, in a first for the utility, energy storage.

As PacifiCorp noted, its 2019 integrated resource plan (IRP) – still a draft at this stage – singles out battery storage as part of a “least-cost portfolio” for the first time.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Consequently, the utility now wants to deploy 600MW of battery systems by 2025 and over 2.8GW by 2038, much of it slated for installation alongside solar plants.

To read the full version of this story, visit our sister site, PV Tech.

24 March 2026
Dallas, Texas
The Energy Storage Summit USA is the only place where you are guaranteed to meet all the most important investors, developers, IPPs, RTOs and ISOs, policymakers, utilities, energy buyers, service providers, consultancies and technology providers in one room, to ensure that your deals get done as efficiently as possible. Book your ticket today to join us in 2026!
15 September 2026
San Diego, USA
You can expect to meet and network with all the key industry players again in 2025 from major US asset owners, operators, RTOs and ISOs, optimizers, software and analytics providers, technical consultancies, O&M technology providers and more.

Read Next

March 16, 2026
Geothermal and battery storage firm Ormat Technologies’ 80MW/320MWh Shirk battery energy storage system (BESS) in Visalia, California, US, has reached commercial operation.
March 16, 2026
According to a representative from sodium-ion (Na-ion) battery energy storage system (BESS) startup Peak Energy, the company will pilot a 3.1MWh system at Energy firm RWE’s Eastern Wisconsin, US lab.
March 13, 2026
New York, US is leading the country in battery energy storage system (BESS) moratoriums, with 97 moratoriums in place, according to renewables service provider Carina Energy.
March 13, 2026
Iron flow battery company ESS Tech Inc highlighted its recent partnership with Google and the acquisition of VoltStorage GmbH, as profitability remained out of reach in 2025.
March 12, 2026
Energy-Storage.news speaks to Willliam Lauwers, head of technology, BESS, at consulting, engineering and quality control firm Enertis Applus+, ahead of the upcoming Energy Storage Summit USA.