Ameresco completes 8MWh battery storage system at US Marine Corps Recruit Depot

By Conor Ryan
LinkedIn
Twitter
Reddit
Facebook
Email
The US$91 million project, which required no upfront capital from the Marine Corps depot, features distributed energy systems designed to withstand potential storm and seismic conditions. Image: Ameresco

Ameresco has completed the construction of a comprehensive energy resiliency and energy infrastructure project at the United States Marine Corps Recruit Depot (MCRD) Parris Island, South Carolina.

The US$91 million project, which required no upfront capital from the Marine Corps depot, features distributed energy systems designed to withstand potential storm and seismic conditions. The distributed generation, energy storage, and secure microgrid controls that Ameresco designed and installed at Parris Island have dramatically enhanced the site’s resilience, giving the installation the capacity to sustain its critical training operations when the local grid is out of commission.

This project, which features an 8MWh battery energy storage system, will save US$6.9 million in annual utility and operational costs, cut utility energy demand by 75%, and lower water consumption by 25%.

MCRD Parris Island signed off on an energy savings performance contract (ESPC) for this installation, which leverages private capital through a Department of Energy contract vehicle back in 2015 with the competitive selection of Ameresco.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Ameresco then replaced an aging central plant with a 3.5MW combined heat and power (CHP) plant and three diesel generators for backup generation, along with installaing 20,000 solar modules at carport and ground-mount sites that provide 5.5MW of power generation.

Nicole Bulgarino, executive vice president at Ameresco, said: “Resiliency at MCRD Parris Island means providing uninterruptible power in support of critical training operations. Distributed generation systems like the comprehensive solution we have just built there deliver a layered defense against threats to the power supply.

“Ameresco is proud to partner with the USMC to lead by example and demonstrate how a military installation can both reduce energy and enhance resiliency with this unique contract vehicle.”

While Ameresco has made inroads with energy storage projects associated with the US military, another company with a long track record with said clients is undergoing some changes.

 in related news, Go Electric, which has designed multiple microgrid projects with integrated energy storage for the US military,  has been acquired by a subsidiary of global energy company Total. Going forward, Go Electric will operate as a wholly owned subsidiary of Saft, a multinational battery energy storage company owned by Total. The price of the acquisition was not disclosed.

15 September 2026
San Diego, USA
You can expect to meet and network with all the key industry players again in 2025 from major US asset owners, operators, RTOs and ISOs, optimizers, software and analytics providers, technical consultancies, O&M technology providers and more.

Read Next

June 11, 2026
DNV has independently verified that Fluence’s global fleet of battery energy storage systems (BESS) achieved 98.7% MW-weighted availability.
June 10, 2026
EDP and SRP complete 200MW/800MWh Arizona BESS, Pathway Power closes $150m facility, and B2U secures Waymo supply deal for second-life EV batteries in grid storage.
June 10, 2026
Gamuda Renewables has secured an interest in the 1,800MWh Hazelwood North solar-plus-storage project in Victoria, Australia.
Premium
June 9, 2026
ESN Premium speaks with Dr Thomas Sisto, of flow battery developer XL Batteries, about using LDES to combat grid strain from heatwaves and data centres.
June 9, 2026
Chinese battery manufacturer CATL will supply 2,400MWh of battery energy storage systems (BESS) for Edify Energy’s Smoky Creek and Guthrie’s Gap Solar Power Stations in central Queensland.