ABB installs solar-storage microgrid at its Gujarat manufacturing facility

LinkedIn
Twitter
Reddit
Facebook
Email
The manufacturing hub is the company’s largest facility in India, with over 3,000 employees. Credit: ABB

Technology provider ABB has inaugurated a microgrid solution at its Vadodora manufacturing facility in Gujarat, India.

The microgrid is said to be the first of its kind to be installed at a manufacturing campus in India using both solar PV and battery energy storage. The technology combination will support the factory’s productivity and enable green power supplies in the evening hours or during cloudy periods during the day.

The manufacturing hub is the company’s largest facility in India, with over 3,000 employees, producing transformers, high voltage products, distribution relays, motors, generators and turbochargers for a variety of national projects and beyond.

ABB’s Ability control and automation system, will serve the microgrid and ensure the optimal use of the renewable energy. A cloud-based remote service system will be deployed for the operations and maintenance of the microgrid.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

“Reliable, resilient and cost-effective power supply through microgrids is key to achieve Make in India targets, speed up industrial development and realize the vision of 24×7 power for all,” said Sanjeev Sharma, managing director, ABB India. “At a time when renewable energy, electric propulsion and digital technologies are disrupting the market, we are proud to partner our nation’s Skill India program through ABB PowerTEC to train the workforce of the future.”

Energy-Storage.News has reported on two other ABB microgrids in recent weeks, one which includes a 30MW battery system at Alinta Energy’s Newman Power Station in Pilbara, Western Australia, at a natural gas-fired facility, was announced as completed in mid-April and another, a fully-contained microgrid project for Jamaica Public Service Company (JPS), is just getting underway.

Additional reporting by Andy Colthorpe

2 February 2027
The Tower Hotel, London, UK
Solar & Storage Finance Europe Summit brings together the developers, investors and lenders financing European solar and storage projects. As grid constraints, curtailment and weaker capture prices put pressure on returns, the summit explores what makes projects bankable, how co-located storage changes the revenue case and where capital providers see investable opportunities. Attendees can compare how their peers structure projects and meet people who could help them move their own projects or investments forward.

Read Next

Premium
November 19, 2026
As AI-driven data centre demand reshapes the US power landscape, BESS technology providers at RE+ highlighted an unexpected competitive advantage.
November 19, 2026
The Bipartisan American Affordability and Jobs Act of 2026 (BAAJA) has been a popular topic of discussion at RE+ 2026 in Las Vegas, Nevada, US.
November 18, 2026
Energy-Storage.news speaks with LG Energy Solution Vertech chief product officer Tristan Doherty at RE+ 2026.
November 17, 2026
The latest edition of PV Tech Power is available to download, full of exclusive content for the downstream solar PV and BESS industries.
November 17, 2026
Waaree ESS has begun commercial production at its 5.15GWh battery pack manufacturing line in Rola, Valsad, Gujarat.