
Waaree Energy Storage Solutions (Waaree ESS), a subsidiary of Mumbai-headquartered solar PV manufacturer Waaree Energies, has begun commercial production at its 5.15GWh battery pack manufacturing line in Rola, Valsad, Gujarat.
The facility marks the second milestone in Waaree ESS’s planned 20GWh energy storage manufacturing roadmap. In July 2026, the company commissioned a 5.15GWh battery energy storage system (BESS) container manufacturing facility at the same location.
With both battery pack and BESS container manufacturing operational at the Rola site, Waaree ESS is progressing towards an integrated domestic energy storage manufacturing value chain.
“Commencing commercial production on our 5.15GWh battery pack manufacturing line marks a major milestone in building Waaree ESS’s fully integrated, Made-in-India energy storage value chain. With battery packs and BESS containers now manufactured at Rola, and lithium cell manufacturing next on our roadmap, we are strengthening domestic capabilities to meet India’s growing demand for utility-scale and commercial and industrial energy storage,” said Sunil Rathi, director – sales, Waaree Energies.
Try Premium for just $1
- Full premium access for the first month at only $1
- Converts to an annual rate after 30 days unless cancelled
- Cancel anytime during the trial period
Premium Benefits
- Expert industry analysis and interviews
- Digital access to PV Tech Power journal
- Exclusive event discounts
Or get the full Premium subscription right away
Or continue reading this article for free
The expansion is backed by INR 10.03 billion (US$107.3 million) raised from strategic investors in January 2026. The funding forms part of the Waaree Group’s INR 100 billion capital expenditure plan for developing 20GWh of advanced lithium-ion cell and battery pack manufacturing capacity.
FESTA inaugurates 3GWh BESS manufacturing facility in Tamil Nadu
In other news, Chennai-headquartered renewable energy firm FESTA Group has inaugurated a BESS manufacturing facility in Tamil Nadu, with a targeted annual production capacity of 3GWh.
Located in the Sriperumbudur, Chennai, industrial region, the facility will cover multiple stages of the BESS value chain, including battery cell testing, grading and sorting, module production, pack assembly, system integration, quality assurance and performance validation, the company said.
The facility marks an expansion of FESTA Group’s manufacturing operations following the establishment of Feston SEV in 2024 to manufacture solar inverters.
Sampath Kumar, CEO, FESTA Group, said, “Feston ESS has been established as an independent business vertical with its own market focus. The new facility gives us the capability to move from component-level manufacturing towards complete BESS integration, including battery modules, packs, testing, quality assurance, and system-level solutions.”
“With Feston ESS, our objective is to build a credible, locally manufactured energy-storage platform that can serve these needs across multiple customer segments and grow with market demand. This facility represents an important step in that direction. It reflects our belief that long-term value will come from reliable products, strong execution, customer trust, and the ability to scale responsibly as India’s energy-storage market develops.”
FESTA Group also plans to develop a 30-acre integrated manufacturing campus in Tirunelveli, Tamil Nadu, as part of its longer-term strategy to expand domestic production and serve Indian and international markets.
The company said the new facility will incorporate quality-control systems focused on product safety, performance and durability. It expects the expansion to support domestic supply chains and skilled employment as India increases its manufacturing capacity for clean-energy technologies.
Since India’s Union Cabinet approved INR 1.86 trillion (US$19.3 billion) for the third phase of the Green Energy Corridor in October 2026, including INR 500 billion for the deployment of 50GWh of battery energy storage systems (BESS) to support renewable energy integration through FY2032-33, several states, including Maharashtra, Rajasthan, Kerala and Tamil Nadu, have introduced policies and frameworks to accelerate storage deployment.
Several companies, including Vikram Solar, Premier Energies, Hero Future Energies and Delectrik Systems, are also expanding their presence in the BESS sector.
Additionally, the Union government approved INR 145 billion in viability gap funding (VGF) for 92GWh of new energy storage capacity, comprising 60GWh of pumped hydro, 30GWh of BESS and 2GWh of alternative storage technologies, last week. The scheme also introduces a 40% domestic content requirement, up from 20%, and is expected to support an estimated INR 976 billion in investments.