New R&D centre for Trojan’s ‘advanced’ lead acid batteries in Ireland

May 21, 2015
LinkedIn
Twitter
Reddit
Facebook
Email

The UK’s Prince Charles visited the IT Sligo site yesterday on an unrelated visit. Image: IT Sligo facebook page / James Connolly / PicSell8
Trojan Battery, manufacturer of deep-cycle lead acid batteries, has announced that it is expanding its research and development capabilities with a new facility in Sligo, Ireland.

The facility will be known as Trojan Battery Ireland Ltd, and will operate as a wholly-owned subsidiary of Trojan Battery Co. The R&D centre will be charged with exploring advanced material additives and fundamental electrochemistry to help advance the company’s storage technology. The company states that it hopes the R&D centre will help it introduce “ground-breaking advancements” to the market quicker.

“Establishing the Sligo facility is a key step in expanding Trojan’s R&D activities, and will strengthen our ability to remain on the cutting edge of battery technology research”,” said Gordon Beckley, senior vice president of engineering and quality assurance for Trojan Battery.

Beckley continued: ““By having a research facility separate from any of Trojan’’s manufacturing plants, allows the Sligo engineering team to remain focused on true research and advanced development, while not being pulled into manufacturing continuous improvement projects. This independence is important as technology innovation plays a larger role in our long term success.”

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Trojan Battery has employed two dedicated research scientists to manage various projects at the Sligo R&D factory.

In an interview with PV-Tech Storage at last year’s Intersolar Europe trade show, the battery marker claimed that its newly-developed ‘Smart Carbon’ technology could help improve the cycle life of lead acid batteries by as much as 15%, of particular interest for partial state of charging applications typically required by renewables.

Trojan expects the location of the R&D facility to help expand its European OEM business, as well as provide better support for its European customers.
The new R&D facility will be located on the campus of the Institute of Technology in Sligo (IT Sligo). Niall McEvoy, head of innovation at IT Sligo welcomed the addition of Trojan Battery, saying that its residency would enable it access to “some of the world’s most advanced R&D capabilities available”.

Trojan’s Smart Carbon batteries. Image: Trojan.

13 October 2026
London, UK
Now in its second edition, the Summit provides a dedicated platform for UK & Ireland’s BESS community to share practical insights on performance, degradation, safety, market design and optimisation strategies. As storage deployment accelerates towards 2030 targets, attendees gain the tools needed to enhance returns and operate resilient, efficient assets.

Read Next

March 11, 2026
Energy firm RWE added 2GW to its US operating capacity in 2025, bringing its total operational capacity to nearly 13GW across the country.
March 5, 2026
Developer Avantus has closed a financing package of over US$300 million for the 100MWac/130MWdc solar, 400MWh BESS Kitt Solar and Energy Storage Project in Pinal County, Arizona, US.
March 5, 2026
From Texas, US, Bimergen Energy has acquired eight BESS projects totalling 79.2MW. Meanwhile, Habitat Energy announced its first US co-located solar-plus-storage partnership with Birch Creek.
March 3, 2026
3.6GWh of solar-plus-storage developments have progressed in Australia this week, with Edify Energy partnering with DT Infrastructure and Flow Power acquiring a 60MW project.
March 3, 2026
Oregon-based utility company Portland General Electric has finalised agreements for more than 1,000MW of new renewable energy and BESS projects.