Copenhagen Infrastructure Partners closes on 750MWh solar-plus-storage project in Mexico

LinkedIn
Twitter
Reddit
Facebook
Email

Danish investment firm Copenhagen Infrastructure Partners (CIP) has reached financial close of the La Esperanza Solar energy storage-plus-solar PV project in the state of Campeche on Mexico’s Yucatán Peninsula.

Announced on 6 August, CIP achieved financial close via its Growth Markets Fund II (GMF II) for the 420MW solar PV and 150MW/750MWh battery energy storage system (BESS) project.

La Esperanza Solar is CIP’s first investment in Mexico to reach financial close and the company claimed that it represents a significant milestone in its growing renewables portfolio in Latin America.

The project financing comprises approximately US$510 million in debt facilities provided by a consortium of five international and regional commercial banks, including BNP Paribas, JPMorgan Chase Bank, Natixis CIB, Santander and Scotiabank.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Equity is funded by the project owners, GMF II, with an expected co-investment from the leading Mexican retirement fund administrator, Profuturo.

According to CIP, La Esperanza Solar has received priority project status from Mexico’s Ministry of Energy (SENER) within the country’s binding planning framework. The project is being developed in collaboration with the federal government and relevant authorities.

La Esperanza Solar also reflects a joint commitment between CIP and the Government of Mexico to bolster the National Electricity System via long-term strategic energy infrastructure investment. The project is underpinned by a long-term power purchase agreement (PPA) with CFE Calificados, the large client commercial arm of Comisión Federal de Electricidad (CFE).

In October 2024, Mexican President Claudia Sheinbaum announced a target of 38%-45% clean energy by 2030.

This May, SENER launched a new call for renewables, including generating and storage assets. To guide project development, the decree included reference examples of potential storage needs across seven regions, totalling approximately 935MW of 3-hour duration BESS.

CIP has been active elsewhere in Latin America, beginning construction on the 300MW/1,500MWh Patache BESS in Northern Chile, in June.

CIP claimed that the solar power shifting and balancing services provided by Patache will reduce reliance on thermal generation during peak hours, lower CO2 emissions, and enabling further integration of large-scale solar energy into the Chilean power system.

Our publisher Solar Media, part of Informa Connect, will host the Energy Storage Summit Latin America 2026 on 26-27 October, 2026, in Santiago, Chile. Energy-Storage.news readers can use our discount code ESN20 at checkout for 20% off tickets.

6 October 2026
Warsaw, Poland
The Energy Storage Summit Central Eastern Europe is set to return in September 2025 for its third edition, focusing on regional markets and the unique opportunities they present. This event will bring together key stakeholders from across the region to explore the latest trends in energy storage, with a focus on the increasing integration of energy storage into regional grids, evolving government policies, and the growing need for energy security.
27 October 2026
Santiago, Chile
Energy Storage Summit Latin America brings together developers, investors, utilities and policymakers to explore how storage is advancing system stability, regulation, deployment and new revenue models across the region. With insights from Chile, Argentina, Brazil, Mexico and beyond, the Summit focuses on financing, policy clarity, hybridisation, supply chain development and project optimisation as LATAM accelerates its storage buildout.
3 November 2026
Málaga, Spain
Understanding technology and supplier selection for Europe’s utility-scale PV market in 2027. PV ModuleTech Europe 2026 is a two-day conference that tackles these challenges directly, with an agenda that addresses all aspects of PV module, inverter and battery supplier selection; product availability, technology offerings, supply chain traceability, quality assurance, factory auditing, system reliability, and supplier bankability.

Read Next

September 18, 2026
In this US news roundup, Eos has received an advance on its DOE loan, FlexGen and Lighshift have partnered on 16 BESS projects, and Georgia Power has energised a 128MW BESS.
September 18, 2026
US battery energy storage system (BESS) developer-operator Jupiter Power has closed a US$1.4 billion financing, supporting 10 US BESS projects totalling 3,600MWh of capacity.
September 18, 2026
All BESS and demand response projects selected under ASL’s 2023 firming tender for New South Wales, Australia, are now operational.
Premium
September 17, 2026
Energy-Storage.news Premium speaks with Randolph Mann, CEO at developer esVolta at the 2026 US Battery Asset Management Summit in Garden Grove, California.
September 17, 2026
Alinta Energy has received the first shipment of battery units for its 250MW Reeves Plains Battery project in South Australia.