India to electrify every home by December 2018 using solar PV, battery storage and LEDs

September 26, 2017
LinkedIn
Twitter
Reddit
Facebook
Email
The INR163 billion (US$2.5 billion) ‘Saubhagya Yojna’ scheme is aimed at both rural and urban households. Credit: ADDevol Design Studio

Indian prime minister Narendra Modi has launched a new programme to electrify every willing household in the country by 31 December 2018, using solar, energy storage batteries and LED lighting.

The INR163 billion (US$2.5 billion) ‘Saubhagya Yojna’ scheme is aimed at both rural and urban households.

While data from a 2011 census (SECC) will be used to help identify un-electrified households, any homes without power not covered under the SECC census will also be eligible on payment of INR500 (US$7.65). More than 80% of the programme’s budget will go towards rural households, with the rest set for urban homes.

The Rural Electrification Corporation (REC) has been appointed as the nodal agency to implement the scheme throughout the country.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Modi had already started a rural electrification programme known as the DDUGJY Aiming to electrify every village in India, but that had not been household specific nor had it specified the use of solar, as the new scheme does.

Solar power packs of 200-300W will be added with battery banks to un-electrified homes – including in remote and hard to access regions – along with five LED lights, a DC fan and a DC power plug. This will also come with repair and maintenance for five years.

Back when the original DDUGJY started, there were more than 18,000 villages that were un-electrified. The government even launched an app so that members of the public could watch real-time as each village became electrified.

The Modi government has the following aims: to reduce the useful of harmful kerosene in homes for lighting, improved education and health services, higher connectivity through radio, `TV and mobiles, greater access to economic activity, improved quality of life “especially for women”, a release noted.

Local institutions will have to collect application forms, distribute bills and collect revenue.

States and Union Territories are required to complete the works of household electrification by the end of 2018.

Last December, former energy minister Piyush Goyal had announced that more than 16,000 Indian households across 800 remote villages would be given a solar panel, with an eight-hour battery storage backup. The latest Modi announcement appears to be a huge extension of this plan.

In May 2016, India’s Ministry of new and Renewable Energy (MNRE) also moved forward with its off-grid solar programme, as part of the National Solar Mission (NSM), after a year of the utility-scale sector stealing the limelight. It promoted the use of solar home lights, solar street lights, power plants, solar pumps and mini and microgrids in rural areas of the country.

Back in 2014, Dr Rahul Walawalkar of the India Energy Storage Alliance (IESA) said that the drive to electrify India’s population, including the 300 million-strong middle class, would drive a decade of energy transformation, in one of the earliest guest blogs published on Energy-Storage.News.

Read Next

November 28, 2025
The Australian government has officially opened CIS Tender 8, targeting 16GWh of energy storage capacity across the NEM.
November 27, 2025
Nostromo Energy’s IceBrick thermal energy storage (TES) technology will participate in the California Independent System Operator (CAISO) wholesale energy market.
November 27, 2025
A joint venture (JV) between EDF and developer AME has begun construction of large-scale battery and solar photovoltaic (PV) projects in Chile, with 2GWh storage capacity.
November 27, 2025
The Western Australian government has launched the first stage of an Expression of Interest (EOI) process for a 50MW/500MWh vanadium flow battery energy storage system (VBESS) in Kalgoorlie.
November 26, 2025
We caught up with the president of system integrator PotisEdge following news of its acquisition by Longi, which marks the Chinese solar PV giant’s move into the energy storage industry.