Fluence wins ‘first full product ecosystem’ BESS project order, in Australia

LinkedIn
Twitter
Reddit
Facebook
Email

Developer Tilt Renewables has enlisted global system integrator Fluence for a 100MW/200MWh BESS project in Victoria, Australia, the first to deploy the full Fluence product ecosystem, the company said.

Tilt Renewables has enlisted the company to build, service and maintain the Latrobe Valley Battery Energy Storage System (BESS) under a 20-year service agreement.

The order from Tilt includes Fluence’s Gridstack BESS solution, its AI-powered bidding software Mosaic and its asset performance management software Nispera, which will optimise the BESS’ market trading and operational performance. Fluence acquired Nispera in April 2022.

The company said that Latrobe Valley will be the first privately funded storage project in Australia to be incorporated into an exclusively renewable generation fleet, and will also be the first to deploy all three products together.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

“We are thrilled to work with Tilt Renewables to deliver the Latrobe Valley BESS, which is our first asset globally that will deploy the full Fluence product ecosystem. Tilt Renewables has been a long-term strategic customer for Fluence Digital, using Mosaic to optimise the market bidding of its wind portfolio since 2019, and we are honoured to extend and strengthen the relationship further with this energy storage project,” said Jan Teichmann, SVP and president, APAC (Asia-Pacific).

Many BESS projects today employ separate parties for the physical BESS solution on the one hand and the market optimisation on the other. The third-party BESS optimisation space has been covered in-depth by Energy-Storage.news recently, including comments from a Germany-based outfit Entrix on the market there and an interview with Habitat Energy, one of the leading players, a few weeks ago.

Tilt’s order is the second project for the Fluence in the Latrobe Valley, where it recently commissioned a 150MW/150MWh BESS at a former coal plant site for project developer Eku Energy and owner Engie.

Fluence also recently bagged several project orders in the UK market, from developer Varco Energy and independent power producer (IPP) Statkraft while securing its second Grid Booster project in Germany with a transmission system operator there in July.

Tilt Renewables is a developer and independent power producer (IPP) claiming to be the largest owner of wind and solar generation in Australia, while the Latrobe Valley project is its first BESS.

Read Next

November 20, 2026
Another BESS Industry Buzz, looking at what people are discussing in the industry plus some of the most notable quotes from the RE+ trade show, which concluded yesterday.
November 20, 2026
EDF power solutions Australia has acquired the 250MW Holloway BESS project in New South Wales (NSW) from developer SynCo Global.
November 20, 2026
Australia committed a record 2.4GW of renewable energy projects to construction in the third quarter of 2026, while battery energy storage systems (BESS) committed in the quarter covered 13% of the new storage capacity needed by 2030.
November 19, 2026
New Zealand’s Electricity Authority has corrected the date from which battery energy storage system (BESS) owners can submit up to 10 price bands in their wholesale market offers.
November 19, 2026
Australian energy company AGL has installed the first 100 units at its 500MW Tomago battery energy storage system (BESS) in the Hunter region of New South Wales (NSW).