Europe deployed 1.9GW of battery storage in 2022, 3.7GW expected in 2023 – LCP Delta

LinkedIn
Twitter
Reddit
Facebook
Email

Some 1.9GW of grid-scale battery energy storage was deployed across Europe last year, of which nearly 85% was in UK, Ireland, Germany and France according to research firm and consultancy LCP Delta.

The company said 170 grid battery storage projects came online last year totalling 1.9GW, a record-breaking year. It is forecasting 3.7GW to come online in 2023, nearly 100% year-on-year growth. The figures are from its new energy storage data platform STOREtrack.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

A press release did not provide a country-level breakdown but LCP Delta did provide this data to Energy-Storage.news, detailed in the infographic below. Hover over a part of the bars in the chart to see which country it represents.

Source: LCP Delta, chart made by Solar Media.

According to the firm’s data, 833MW was deployed in GB in 2022 (UK excluding Northern Ireland). Solar Media’s Market Research UK Battery Storage Project Database Report pegs the figure at around 750MW/800MWh including Northern Ireland. In either case the figure corresponds to around 40% of the European total.

LCP Delta pegs Ireland as the next-highest market with 328MW deployed in 2022 (17%), followed by Germany’s 226MW (12.3%) and France’s 224MW (11.6%). The four countries combined therefore accounted for 84.4% of the 1.9GW deployed in 2022.

Italy is expected to jump substantially, from 1.3% of deployments in 2022 to 22.7% in 2023.

What were claimed to be the largest (by MWh) projects in Europe overall, and Europe excluding the UK, both came online last year. Harmony Energy brought a 196MWh system online in Yorkshire, Northern England, while two 100MWh projects in Belgium were commissioned around the turn of the year; one from developer Corsica Sole and another from Nippon Koie-Aquila Clean JV.

The European Union made several high-profile policy moves last week to help foster the growth of the continent’s energy storage market which were welcomed by the industry.

Its new Net Zero Industry Act, part of the Green Deal Industrial Plan, was proposed last week to help “scale up the clean energy transition quickly” and included energy storage as one of the technologies covered. Earlier in the week, its proposed Electricity Market Design reforms were welcomed by energy storage trade bodies.

LCP Delta was formed through the merger of LCP Energy and energy transition analysis and research group Delta-EE.

24 February 2026
InterContinental London - The O2, London, UK
This isn’t just another summit – it’s our biggest and most exhilarating Summit yet! Picture this: immersive workshop spaces where ideas come to life, dedicated industry working groups igniting innovation, live podcasts sparking lively discussions, hard-hitting keynotes that will leave you inspired, and an abundance of networking opportunities that will take your connections to new heights!

Read Next

May 20, 2025
Battery storage developers and owner-operators Eku, Alcemi, Field and Energy Optimisation Solutions (EOS) make UK project progress with finance and planning approvals.
Sponsored
May 19, 2025
Goldwind discusses how its unmatched system-level expertise from the renewables space makes it ideally placed to solve the key industry challenges it sees emerging in energy storage.
May 15, 2025
Utility and power generation firm Engie has started construction on a 100MW/400MWh BESS project in Belgium, for which it has enlisted system integrator NHOA Energy to provide the BESS.
May 9, 2025
Recent product announcements from major BESS suppliers shows a divergence from the 20-foot container as the only viable form factor.
May 8, 2025
CATL has launched a 9MWh grid-scale BESS product which comprises two smaller units stacked on top of each other, which it said gets around weight challenges for transportation.

Most Popular

Email Newsletter