EPC DEPCOM building Puerto Rico solar-plus-storage plant with 51MW BESS

By Jonathan Touriño Jacobo
LinkedIn
Twitter
Reddit
Facebook
Email

DEPCOM Power, a provider of engineering, procurement and construction (EPC) work, is midway through construction on what it has called Puerto Rico’s “largest” solar-plus-storage project.

Located in Salinas, the Ciro One project is expected to begin operations at the end of 2024. It will have a capacity of 90MW for solar PV and a battery energy storage system (BESS) with an output of 51.5MW, which integrates a lithium-titanate oxide (LTO) battery. Once operational, the EPC firm will also operate and maintain the solar-plus-storage plant for five years.

The PV system has been designed to withstand hurricane-force winds – which Puerto Rico is prone to experience, and was severely hit by hurricanes Irma and Maria in 2017 – with a lower panel tilt angle and east/west orientation, while inverters include salt fog filters to mitigate effects of salinity on the system’s power electronics. The plant is built alongside developer Ciro Energy Group and local subcontractor Lord Construction.

Utility-scale projects in Puerto Rico are scarce due to the limited land available on the island, while its residential market is much more developed. This was fast-tracked after the territory was hit by hurricanes Irma and Maria, which put the island in a total blackout. These unfortunate events boosted interest in and consciousness of solar-plus-storage on the island’s residential market, as covered in a recent PV Tech Premium article.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

To read the full version of this story, visit PV Tech.

DEPCOM VP of energy storage business development Greg Weyl recently spoke to Energy-Storage.news about the company’s combined EPC and operations and maintenance (O&M) role at a 200MW/800MWh battery energy storage system (BESS) for Arizona utility Tucson Electric Power.

Energy-Storage.news’ publisher Solar Media will host the 6th Energy Storage Summit USA, 19-20 March 2024 in Austin, Texas. Featuring a packed programme of panels, presentations and fireside chats from industry leaders focusing on accelerating the market for energy storage across the country. For more information, go to the website.

Read Next

November 24, 2026
APA Group has started construction on its 72MW solar PV plant and 52MW/104MWh BESS at Mount Isa in north-west Queensland, Australia.
November 20, 2026
Energy transition expert Chris Nelder looks at which countries are leading the way in the geopolitical race for clean energy supremacy.
November 18, 2026
EsVolta has completed over US$180 million in financing for BESS projects in Texas, while Fluence has won a 200MWh project there.
November 17, 2026
The latest edition of PV Tech Power is available to download, full of exclusive content for the downstream solar PV and BESS industries.
November 17, 2026
Spain-headquartered power conversion system (PCS) manufacturer Power Electronics is supplying grid-forming inverters and DC/DC converters for Edify Energy’s Smoky Creek and Guthrie’s Gap solar-plus-storage projects in Queensland, Australia.