EPC DEPCOM building Puerto Rico solar-plus-storage plant with 51MW BESS

By Jonathan Touriño Jacobo
LinkedIn
Twitter
Reddit
Facebook
Email

DEPCOM Power, a provider of engineering, procurement and construction (EPC) work, is midway through construction on what it has called Puerto Rico’s “largest” solar-plus-storage project.

Located in Salinas, the Ciro One project is expected to begin operations at the end of 2024. It will have a capacity of 90MW for solar PV and a battery energy storage system (BESS) with an output of 51.5MW, which integrates a lithium-titanate oxide (LTO) battery. Once operational, the EPC firm will also operate and maintain the solar-plus-storage plant for five years.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The PV system has been designed to withstand hurricane-force winds – which Puerto Rico is prone to experience, and was severely hit by hurricanes Irma and Maria in 2017 – with a lower panel tilt angle and east/west orientation, while inverters include salt fog filters to mitigate effects of salinity on the system’s power electronics. The plant is built alongside developer Ciro Energy Group and local subcontractor Lord Construction.

Utility-scale projects in Puerto Rico are scarce due to the limited land available on the island, while its residential market is much more developed. This was fast-tracked after the territory was hit by hurricanes Irma and Maria, which put the island in a total blackout. These unfortunate events boosted interest in and consciousness of solar-plus-storage on the island’s residential market, as covered in a recent PV Tech Premium article.

To read the full version of this story, visit PV Tech.

DEPCOM VP of energy storage business development Greg Weyl recently spoke to Energy-Storage.news about the company’s combined EPC and operations and maintenance (O&M) role at a 200MW/800MWh battery energy storage system (BESS) for Arizona utility Tucson Electric Power.

Energy-Storage.news’ publisher Solar Media will host the 6th Energy Storage Summit USA, 19-20 March 2024 in Austin, Texas. Featuring a packed programme of panels, presentations and fireside chats from industry leaders focusing on accelerating the market for energy storage across the country. For more information, go to the website.

17 June 2025
Napa, USA
PV Tech has been running PV ModuleTech Conferences since 2017. PV ModuleTech USA, on 17-18 June 2025, will be our fourth PV ModulelTech conference dedicated to the U.S. utility scale solar sector. The event will gather the key stakeholders from solar developers, solar asset owners and investors, PV manufacturing, policy-making and and all interested downstream channels and third-party entities. The goal is simple: to map out the PV module supply channels to the U.S. out to 2026 and beyond.
1 July 2025
London, UK
UK Solar Summit 2025 will look at the role solar currently plays in the energy mix, how this will change over the coming years and how this aligns with net-zero and other government targets. We will break down all these challenges and help build up solutions through discursive panels, motivational keynotes and case studies, with newly added interactive sessions to get you moving and meeting your peers, making the connections you need to boost your business.

Read Next

February 12, 2025
Gold Green Energy has secured consent for a 400MWh solar-plus-BESS site, whilst AEMO has seen 18.1GW of BESS seeking a connection to the NEM.
February 11, 2025
Virtual power plants (VPPs) are networks of small-scale, distributed energy resources, such as solar panels or batteries (and in some instances vehicles) which can together function as a single power plant, providing stability to the electric grid.
Premium
February 6, 2025
BrightNight has kicked off the permitting process for one of its hybrid solar and BESS projects located in Wasco County, Oregon.
February 6, 2025
EDF Renewables North America has begun operations on a 375MW/600MWh solar-plus-storage project in California, US.
Premium
February 6, 2025
ESN Premium hears from independent power producer (IPP) Econergy about its expansion from solar into BESS across Europe.

Most Popular

Email Newsletter