Canadian Solar’s project development arm has 27GWh pipeline of BESS

LinkedIn
Twitter
Reddit
Facebook
Email

Canadian Solar has said its project development arm has a pipeline of more than 27GWh of battery storage projects, while its system integrator business has a pipeline exceeding 4GWh.

The vertically integrated solar PV company announced its latest quarterly financial results last week. Our colleagues at PV Tech reported on 24 May that Canadian Solar unveiled a major new PV manufacturing strategy as it said revenues for Q1 2022 stood at US$1.25 billion, within the range of its guidance.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Meanwhile, Canadian Solar has been steadily increasing its involvement in the battery storage space over the past couple of years, through both its Global Energy project development division and CSI Solar, its manufacturing and system integration division.

The company has guided that it will ship 1.8GWh to 1.9GWh of battery storage this year and make combined solar and storage project sales worth 2.1GW to 2.6GW, alongside 20GW to 22GW of expected PV module shipments, to earn revenues within the range of US$7 billion to US$7.5 billion.

Almost all of the Global Energy business’ projects awarded to date and now in construction have been in North America, with 1,400MWh in the region and just 20MWh outside, in the Asia-Pacific region.

Of a total claimed pipeline of 24,655MWh of potential project opportunities, over 15,400MWh are in North America (see chart below).

Region In construction Backlog Pipeline Total
North America 1,400 15,479 16,879
Latin America 1,050 2,860 3,910
EMEA 56 2,617 2,673
Japan 19 19
Asia-Pacific (exc China, Japan) 20 2,280 2,300
China 300 1,400 1,700
TOTAL 1,420 1,406 24,655 27,481
Canadian Solar Global Energy’s storage project development pipeline as of 31 March 2022, in MWh.

CSI Solar’s battery storage system integration business meanwhile has a project pipeline totalling 7,172MWh globally, including 861MWh with long-term service agreements (LTSAs) in place, 1,572MWh in construction or contracted for, 340MWh of forecasted contract wins and 4,399MWh of prospective opportunities it is pursuing.

Forecasted opportunities are considered to be 75% likely to be won, the pipeline of prospective opportunities falls below that threshold, while projects in construction or contracted for are expected to be completed within a year or year-and-a-half.

CSI Solar earned US$82.5 million in the three months ending 31 March 2022, a massive leap from the first quarter of 2021 when it earned just US$2.358 million, although it was slightly down quarter-on-quarter from US$88.43 million.

Group CEO Dr Shawn Qu said Canadian Solar’s battery divisions are “winning contracts in new markets and segments, while continuing our development of proprietary battery storage technologies for both utility-scale and residential solutions”.

Canadian Solar entered the UK battery storage market during the quarter, winning an EPC contract for a 100MWh project.

The company’s US developer subsidiary Recurrent Energy featured in a recent article for our quarterly journal PV Tech Power. The article focuses on the rapid rise of solar-plus-storage in the US and Recurrent Energy’s head of energy storage Lucas Moller discussed how all of the company’s hybrid solar and storage projects to date are in California, but that in much of the southwest US, energy storage is increasingly key to the business case for solar PV.

17 June 2025
Napa, USA
PV Tech has been running PV ModuleTech Conferences since 2017. PV ModuleTech USA, on 17-18 June 2025, will be our fourth PV ModulelTech conference dedicated to the U.S. utility scale solar sector. The event will gather the key stakeholders from solar developers, solar asset owners and investors, PV manufacturing, policy-making and and all interested downstream channels and third-party entities. The goal is simple: to map out the PV module supply channels to the U.S. out to 2026 and beyond.
1 July 2025
London, UK
UK Solar Summit 2025 will look at the role solar currently plays in the energy mix, how this will change over the coming years and how this aligns with net-zero and other government targets. We will break down all these challenges and help build up solutions through discursive panels, motivational keynotes and case studies, with newly added interactive sessions to get you moving and meeting your peers, making the connections you need to boost your business.

Read Next

January 17, 2025
New Mexico, US utility Kit Carson Electric Cooperative (KCEC) has received US$231 million from the US Department of Agriculture (USDA) to build hydrogen and solar facilities with long-duration energy storage (LDES).
January 17, 2025
This edition of news in brief focuses on energy storage technologies that are emerging or on the path to commercialisation.
January 17, 2025
System integrator Powin contributes to the latest of our Year in Review series, after a year in which it expanded into Europe and launched a new BESS product.
January 17, 2025
Chinese battery manufacturer Rept Battero has announced plans to develop an 8GWh gigafactory in Indonesia specialising in lithium-ion cells for battery energy storage systems (BESS).
Premium
January 16, 2025
Officials in Greene County, North Carolina will delay issuing a special use permit for the construction of a hybrid solar and BESS facility proposed by NextEra Energy Resources.

Most Popular

Email Newsletter