UL Solutions launches certification pathway for modular DC BESS

LinkedIn
Twitter
Reddit
Facebook
Email

Science safety leader UL Solutions has announced a new certification pathway intended to help manufacturers of modular direct current (DC) battery energy storage systems (BESS).

Announced 20 October, the certification could help DC BESS manufacturers bring products to market with greater flexibility and clearer documentation for installation reviews.

The systems covered by the new pathway are often used for backup power at critical infrastructure sites and for grid-scale energy storage applications.

DC BESS can help reduce energy losses by limiting the number of times electricity must be converted between alternating current (AC) and DC, and can also simplify connections to solar panels, backup generators and other equipment.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Many of these systems use a modular design that allows manufacturers to combine different components for individual projects. However, confirming that components work safely together can add complexity to certification and installation reviews.

The new certification programme offers manufacturers an alternative to seeking a full matched-assembly system listing from the outset. When a compatible subsystem is identified, the resulting certification documentation provides manufacturers, developers and code authorities with information about the evaluated configuration.

“Modular energy storage designs require a clear way to demonstrate how the system and its critical subsystems work together,” said Wesley Kwok, vice president and general manager of the Energy and Industrial Automation group at UL Solutions. “This certification programme gives manufacturers, developers and code authorities documented information about evaluated system combinations while supporting a more flexible approach to DC energy storage system design.”

Under the programme, UL Solutions evaluates the DC ESS together with each identified subsystem against the applicable requirements of UL 9540, the Standard for Energy Storage Systems and Equipment. The evaluation covers electrical, communication and interoperability aspects between the system and its evaluated subsystems.

Compatible subsystem models are documented in the UL Product iQ certification database under the DC ESS certification category, enabling code authorities to verify evaluated combinations.

UL 9540 testing covers electrical, electrochemical, mechanical and other aspects of energy storage technologies used in systems intended to supply electrical energy. Its evaluation framework includes charging and discharging, protection, controls, communication between devices, and other system-level considerations.

The certification pathway comes as DC block designs grow in popularity within the BESS market, with a trend towards larger, 5MWh-plus, 20-foot units driven largely by cost efficiencies, particularly on large-scale US projects.

Industry figures have noted that higher energy density within these DC blocks reduces the amount of rigging, anchor bolts, auxiliary connections and fire systems required per unit of capacity.

3 November 2026
Málaga, Spain
Understanding technology and supplier selection for Europe’s utility-scale PV market in 2027. PV ModuleTech Europe 2026 is a two-day conference that tackles these challenges directly, with an agenda that addresses all aspects of PV module, inverter and battery supplier selection; product availability, technology offerings, supply chain traceability, quality assurance, factory auditing, system reliability, and supplier bankability.
22 February 2027
InterContinental London - The O2, London, UK
The Future of Energy Storage Starts Here Three days in London where developers, IPPs, investors, utilities and the manufacturers building the technology come to close deals, not swap business cards. If you need to be in the room with the people deploying capital into European storage, this is that room.
20 April 2027
Renaissance Dallas at Plano Legacy West Hotel, Dallas, Texas, Dallas
Policy, Procurement and Power Demand: Defining the Next Chapter for Energy Storage. Two days in Dallas where developers, IPPs, investors, utilities and the manufacturers building the technology come to close deals, not swap business cards. If you need to be in the room with the people deploying capital into US storage, this is that room.

Read Next

October 21, 2026
Distributed energy storage company Viridi and developer and financier Good Carbon Co. have announced the deployment of a 3.75MWh energy storage project in Buffalo, New York.
Premium
October 21, 2026
IndiGrid COO discusses India’s BESS growth, challenges, tariff pressures, safety standards and localisation as the market scales up.
October 21, 2026
Foresight Group has acquired the 100MW/400MWh Nivala BESS via its Foresight Energy Infrastructure Partners II (FEIP II) fund.
October 21, 2026
India’s BESS pipeline exceeds 100GW, but financing, execution and tariff pressures threaten delivery of 411.4GWh of storage by FY2032.
October 21, 2026
Spain-headquartered power electronics manufacturer Ingeteam has supplied power conversion systems (PCS) for around 65MW/130MWh of battery storage projects in Victoria, New South Wales (NSW) and South Australia.