Tesla supplying 68MWh of Megapack battery storage to Fotowatio’s second project in UK

LinkedIn
Twitter
Reddit
Facebook
Email
FRV-Harmony Energy’s already-operational Holes Bay project in England. FRV said in late 2019 that it has a “strategic plan to develop energy storage projects” around the world. Image: Harmony Energy.

Developer Fotowatio Renewable Ventures (FRV) has unveiled the second utility-scale battery project in its “strategic plan to develop energy storage projects globally,” having closed funding and construction contracts for the 34MW / 68MWh project in West Sussex in southern England, UK.

As with its first utility-scale battery project, also in the UK, FRV is collaborating with local developer Harmony Energy on the Contego project, made up of a system of 28 Tesla Megapack lithium-ion battery systems that will use Tesla’s Autobidder AI software for real-time trading and control.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Work on the project is set to start this month near Burgess Hill in West Sussex, with the site expected to be completed in 2021, making the project one of the largest battery energy storage plants in the UK.

It comes as part of a strategic energy storage pipeline that is set to be launched globally, with the two companies having already worked together on the Holes Bay battery storage project, also in the south of England. This also utilises Tesla's Megapacks, although that one consists of six Megapack, with a total output and capacity of 7.5MW / 15MWh.

Holes Bay has been operating since June 2020, and has participated in the EPEX spot market, Firm Frequency Response (FFR) and the Balancing Mechanism (BM), being the first site to go live in National Grid ESO’s new wider access application programming interface for the BM.

To read the full version of this story visit Solar Power Portal

Read Next

June 12, 2025
IPP Econergy has entered the energy storage market in Germany with two BESS project acquisitions totalling 100MW/200MWh of capacity.
Premium
June 12, 2025
In this blog, ESN Premium speaks with Fluence’s Rob Hills and Sam Markham about hybrid assets and trends in Australia’s NEM.
June 11, 2025
US battery storage system integrator Powin has filed for Chapter 11 bankruptcy at a court in New Jersey.
June 11, 2025
Renewable energy developer ACEnergy has seen its 250MW Joel Joel battery energy storage system (BESS) in Victoria, Australia, granted its 5.3.4A notification.
June 10, 2025
Details on the wind-down of US-based BESS firm American Energy Storage Innovations (AESI) have come out, while battery recycler Li-Cycle has filed for Chapter 15 bankruptcy and been ordered to cease stock market trading.

Most Popular

Email Newsletter