Dutch transmission system operator (TSO) TenneT says the Netherlands will need 9GW of large-scale battery energy storage system (BESS) capacity connected to its grid by 2030.
In a big week for the grid-scale energy storage market in Italy, regulators have approved new grid storage-specific auction rules and a chunk of Aura Power’s 500MW-plus pipeline of BESS projects.
A regulatory framework put in place by Italy’s grid operator TERNA has enabled Enel X to aggregate residential energy storage systems to pool their capabilities.
Italy’s electric system operator, Terna, approved contracts for dozens of megawatts (MWs) of energy storage facilities to serve grid-balancing applications each month throughout 2019.