Vehicle-to-grid (V2G) specialist The Mobility House is moving into large-scale BESS project development and optimisation in Germany, starting with a 750MW project.
A battery storage project using second-life electric vehicle (EV) batteries is set to be built in Germany, with an aim of developing an installed capacity of 20MW.
Over the last thousand days, project partners from all walks of life in the energy sector have come together to deliver Europe’s largest commercial energy storage system using second life and new battery modules. Energy.Sorage-News attended the launch at Amsterdam’s Johan Cruyff ArenA to find out what the project has to offer.
Daimler joint venture to auction stored energy from new 13MWh EV battery storage site back to German energy network operators; Bosch and BMW open smaller EV battery storage facility in Hamburg.