System integrator NHOA Energy will provide Spanish transmission system operator (TSO) Red Eléctrica with 140MW/105MWh of BESS for two separate storage-as-transmission projects on the Balaeric Islands.
IPP Genera PR has chosen Tesla to provide the BESS technology for a 430MW/1,720MWh pipeline of projects in Puerto Rico, set to enter commercial operations at the end of 2025.
The energy regulator of Grenada is seeking expressions of interest (EOI) for a solar or solar-plus-storage project at the Caribbean island nation’s main international airport.
The Council of Menorca, one of Spain’s Balaeric islands, has detailed its energy transition plan for the next four years including 18MWh of distributed battery energy storage systems (BESS).
Energy Vault and a coal mining company owned by the local government in Sardinia, Italy, have signed a land lease agreement to deploy a project combining gravity energy storage and BESS technology.
A double-header of news from Central America and the Caribbean, with Belize seeking consultants for a 40MW BESS and Wärtsilä commissioning a hybrid project in the US Virgin Islands.
System integrator Wärtsilä will provide the state-owned utility on the Carribean island of Curaҫao with a battery energy storage system (BESS) of 25MW/25MWh.
System integrator Flexgen has partnered with IPP Arclight and its subsidiary Infinigen Renewables to deploy a PV co-located 15MW BESS project in Puerto Rico.
BESS developer and operator Plus Power has brought a 185MW/565MWh project online in Hawaii, US, which it claimed is the “most advanced grid-scale BESS in the world”.
Construction work has started on the first major solar-plus-storage project in the Dominican Republic, which features a 24.8MW/99MWh battery energy storage system (BESS).