Australian renewable energy developer Edify Energy has confirmed that the 185MW/370MWh Koorangie battery energy storage system (BESS) in Victoria is fully operational.
The Australian Energy Market Operator (AEMO) has made grid-forming BESS a priority for the National Electricity Market (NEM) and South West Interconnected System (SWIS) for 2026.
Huawei Digital Power has successfully commissioned what it claims is Cambodia’s first grid-forming battery energy storage system (BESS) certified by TÜV SÜD.
French independent power producer (IPP) Neoen has started operations at its 270MW/540MWh Western Downs stage one battery energy storage system (BESS) in Queensland, Australia.