ONE Nuclear Energy executes LOI for 2.88GWh BESS and gas plant co-located with Louisiana data centre

LinkedIn
Twitter
Reddit
Facebook
Email

Gas and nuclear energy developer ONE Nuclear Energy has executed a binding letter of intent (LOI) to develop a 2.88GW natural gas plant and 700MW/2.88GWh energy storage system, co-located with a high-capacity data centre campus.

Announced 31 August, the LOI for the Project Cayman natural gas plant and battery energy storage system (BESS) was executed with an unnamed “prominent Louisiana landowner group.”

ONE Nuclear said the project complements utility Entergy’s substantial expansion of regional transmission infrastructure, reinforcing ONE Nuclear’s dedication to supporting Louisiana’s growing industrial and technology industries.

Project Cayman is positioned strategically adjacent to Louisiana’s RiverPlex MegaPark, northeast of SpaceX’s recently announced infrastructure development. The facility will support these regional economic growth initiatives by introducing dispatchable generation capacity, energy storage and technology infrastructure in proximity to new industrial demand and transmission investment, with the goal of enhancing regional grid stability.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

It is unclear who the data centre campus is for. Local reporting from August stated that there are not currently any data centres planned for Ascension Parish, where RiverPlex MegaPark is located, but that the Parish has been working to introduce zoning standards for potential data centre projects.

The US Environmental Protection Agency (EPA) has recently put forward a new regulation that would remove federal mandates requiring states to publicly disclose and seek community feedback on air pollution permit applications for various industrial facilities, including new data centres and the power generation plants required to operate them.

This move comes as data centre approvals face increasing scrutiny, with multiple US states, including Georgia, New York, Pennsylvania, South Carolina, Vermont, and others having either introduced or passed moratoriums or other pauses on data centre development.

This summer, Amazon, Google and Microsoft disclosed double-digit emissions growth in their 2025 environmental sustainability reports, primarily attributed to electricity consumption. According to sustainability media platform Trellis Group, reported emissions from power usage surged by over one-third at Amazon and Google, whilst Microsoft recorded an increase exceeding 20%.

Technology publication WIRED recently reported that gas-fired power plants serving data centres are engineered with significantly lower efficiency than grid-connected gas power plants—potentially increasing their CO2 emissions.

The North American Electric Reliability Corporation (NERC) also recently issued its most urgent grid reliability warning in response to AI data centres causing massive power fluctuations.

NERC’s alert outlined seven mandatory actions for registered entities to implement immediately, citing “customer-initiated large load reductions and significant oscillations that occur in seconds, leaving little or no room for real-time responses, threatening bulk power system (BPS) reliability.”

Energy-Storage.news Premium spoke to three experts on the topic, including Thomas Sisto, co-founder and CEO of flow battery company XL Batteries, who stated, “We’re not talking about small fluctuations anymore—we’ve seen events where 1,000MW or more dropped off the grid in a matter of seconds. Now think about where this is headed: individual AI campuses drawing several gigawatts, which is the power demand of a small city. When a load that size ramps up or down within milliseconds, the grid simply wasn’t built to absorb that.”

ONE Nuclear stated that community outreach has already begun for Project Cayman and is expected to include public information meetings with local parishes, governmental agencies and other project stakeholders from September through December.

Battery Asset Management Summit USA 2026 will be held 15-16 September in Garden Grove, California, hosted by Energy-Storage.news publisher Solar Media (part of the Informa Group). The agenda emphasises addressing the roles of AI, cybersecurity, and second-life applications, broken down into two tracks: Technical Asset Management and Commercial Asset Management. This year, the conference is also co-located with Solar & Storage Finance Summit USA. Visit the official site for more details.

6 October 2026
Warsaw, Poland
The Energy Storage Summit Central Eastern Europe is set to return in September 2025 for its third edition, focusing on regional markets and the unique opportunities they present. This event will bring together key stakeholders from across the region to explore the latest trends in energy storage, with a focus on the increasing integration of energy storage into regional grids, evolving government policies, and the growing need for energy security.
13 October 2026
London, UK
Now in its second edition, the Summit provides a dedicated platform for UK & Ireland’s BESS community to share practical insights on performance, degradation, safety, market design and optimisation strategies. As storage deployment accelerates towards 2030 targets, attendees gain the tools needed to enhance returns and operate resilient, efficient assets.
3 November 2026
Málaga, Spain
Understanding technology and supplier selection for Europe’s utility-scale PV market in 2027. PV ModuleTech Europe 2026 is a two-day conference that tackles these challenges directly, with an agenda that addresses all aspects of PV module, inverter and battery supplier selection; product availability, technology offerings, supply chain traceability, quality assurance, factory auditing, system reliability, and supplier bankability.

Read Next

September 22, 2026
Residential battery energy storage systems (BESS) across California discharged more than 580MW of peak power to the state’s grid on the evening of 9 September 2026 via a Tesla-Sunrun VPP.
September 22, 2026
Utility PG&E has selected six new California microgrid projects for a US$30 million investment, while Massachusetts’ Department of Energy Resources is awarding US$40 million across 36 BESS projects.
September 22, 2026
Nova Scotia Power has inaugurated three 50MW/200MWh battery energy storage systems (BESS) in Bridgewater, Waverley and White Rock, now Atlantic Canada’s largest battery storage facilities.
September 22, 2026
Covenergo and Delta Capacity have begun construction on AKKU One, a standalone 125MW/300MWh battery energy storage system (BESS) in Lapinlahti, Finland, with commissioning targeted for the fourth quarter of 2027.
September 22, 2026
Lightsource bp has referred a hybrid wind, solar and BESS facility to the federal government for assessment under the EPBC Act.