NextEra to install 135MW of energy storage for Indiana utility NIPSCO’s 900MW solar build-out

October 23, 2020
LinkedIn
Twitter
Reddit
Facebook
Email
Image: NextEra Energy Resources.

Indiana’s solar capacity is set to surge in the next three years as the state’s second-biggest utility unveils plans to develop three large-scale PV projects, two of which will include battery storage.

Northern Indiana Public Service Company (NIPSCO) has secured build-transfer agreements with subsidiaries of NextEra Energy Resources to develop 900MW of solar as well as 135MW of battery storage.

NextEra Energy Resources will construct the projects and NIPSCO will enter into joint ventures to own, operate and maintain some facets of these assets once construction is complete.

The buildout consists of: Dunns Bridge Solar I, a 265MW project in Jasper County; Dunns Bridge Solar II, a 435MW park paired with 75MW of battery storage and also located in Jasper County; and Cavalry Solar, a 200MW development with 60MW of battery storage to be constructed in White County. All are expected to be operational by 2023.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

To read the full version of this story visit PV Tech.

24 March 2026
Dallas, Texas
The Energy Storage Summit USA is the only place where you are guaranteed to meet all the most important investors, developers, IPPs, RTOs and ISOs, policymakers, utilities, energy buyers, service providers, consultancies and technology providers in one room, to ensure that your deals get done as efficiently as possible. Book your ticket today to join us in 2026!

Read Next

January 16, 2026
Duke Energy, Elevate Renewables, and Fluence Energy, along with BrightNight and Cordelio Power, are advancing BESS projects across the BESS.
January 15, 2026
Developer Apex Clean Energy has announced financing of three utility-scale renewable energy projects across Texas, Ohio, and Illinois, including the Raven Storage project in Wharton County, Texas.
January 15, 2026
San Diego-based home battery storage company NeoVolta has formed NeoVolta Power, a joint venture (JV) to develop a US battery energy storage system (BESS) manufacturing platform in Pendergrass, Georgia.
January 15, 2026
ASL has launched a consultation on a new Hybrid Generation LTESA product alongside its 2026 NSW Consumer Trustee Investment Priorities.
Premium
January 14, 2026
Energy-Storage.news Premium speaks with Phil Tonkin, field chief technology officer at Dragos, and Dr. Peter Fox-Penner, a Brattle principal, on BESS cybersecurity.